Home Companies Dongguan Zehui machinery equipment co., ltd

Semi - Automatic Squire Sponge Foam Making Machine For Furniture Mattress

Dongguan Zehui machinery equipment co., ltd

Contact Us

[China] country

Trade Verify

Address: Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China

Contact name:Wang

Inquir Now

Dongguan Zehui machinery equipment co., ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Semi - Automatic Squire Sponge Foam Making Machine For Furniture Mattress

Country/Region china
City & Province dongguan guangdong
InquireNow

Product Details

 

Semi - Automatic Squire Sponge Foam Making Machine For Furniture Mattress

 

ZHFP-007 Semi-automatic Foaming Machine

  • Large material automatically measure(measuring is automatically set)
  • Material temperature automatic control
  • Non-stick surface treatment on stirring shaft and stirring barrel
  • Imported inverter and PLC automatic control
  • Be equipped with stainless steel small feed tank (manually add small material)

Main specification

 

 Dimension L2.8 m×W1.5m×H2.5m
 Foam mould size(can be adjusted) W1500-2000×L2000-3000×H1200 two sets
 Foaming material Group 7 groups, man-machine interface control
 Foaming height Max 1200mm
 Foaming density 8Kg/m³~100kg/m³
 Foaming speed 2000r/min~7000r/min
 Max total output 230L/time
 Mixing –head motor 11kw
 Total power About 43 kw

 

 

How is the packing of the machine?

 

The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be simple pack with paper or foam sheet with plastic film.

 

How many container will be needed for the whole set of machine?

 

For the standard 7 groups of Semi-Automatic continous foam machine Total one containers is enough 1*40HQ. In order to save the place and the cost of delivery we will also put some parts that inside the raw material tank.

We will try the best way to pack all the machine well and also save the freight cost.

 

 

Our Services

 

1. We will help to design the layout of the machine that put in your factory.

 

2. We will send 2-4 experience engineers to install and testing the machines.

 

3. We will teach your engineer how to operate the machine and how to maintain the machines.

 

4. We will give you the machine operation manual and the best formulation for target products that you are going to make.

 

5. We will help to buy the best raw material for making the foam if you needed.

 

 

FAQ:

 

Q: How many days for the install and testing of the machine?

 

A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

 

Q: For the cost of the engineer how much I need to pay?

 

A: You need to pay USD40 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.

 

Q:During the foaming if we have some problems abt the foam and the machine how can we do ?

 

A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.

 

 

The main part of the machine

 

 

 

 

 

 

semi_auto_foam machine specification.pdf

Hot Products

High Rebond And Memory Foam Making Production Line Five Formular Continuous Product Description The ...
Continuous Foam Production Line / Foam Manufacturing Equipment For Mattress ZHMACH Horizontal ...
8~100kg/m3 Density Sponge Continuous Foam Production Line For Mattress ZHMACH Horizontal Continuousl...
Zehui Automatic Long Polyurethane Foam Making Machine Line For Mattress ZHMACH Horizontal Continuous...
Zehui Automatic Long Polyurethane Foam Making Machine Line For Mattress The ZHMACH horizontal ...
8~100kg/m3 Density Sponge Continuous Foam Production Line For Mattress Description of Foam ...