Home Companies Dongguan Zehui machinery equipment co., ltd

Siemens Invertor Low Pressure Foam Machine , PU Foam Mattress Making Machine

Dongguan Zehui machinery equipment co., ltd

Contact Us

[China] country

Trade Verify

Address: Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China

Contact name:Wang

Inquir Now

Dongguan Zehui machinery equipment co., ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Siemens Invertor Low Pressure Foam Machine , PU Foam Mattress Making Machine

Country/Region china
City & Province dongguan guangdong
InquireNow

Product Details

 

Siemens Invertor Low Pressure Foam Machine , PU Foam Mattress Making Machine

 

 

Product Description

 

The device foam production line is an automatic continous foaming machine for producing flexible polyurethane foam used in furniture,shoe material,packing,electron,garment and transportation industrial.it's the ideal production equipment for large-scale foaming.

 

We use the siemens invertor/motor and U.S. viking pump and some good spare parts that good for make the flexible foam. The density we can make is from D8-D100 and we can add abt 50% of the lime powder during density above D23.

 

[Specifications]

 

(1)The whole machine parts specifications:

 

1. Foaming control Platform(standard) L3m×W2.52m×H0.7m

2. Oven declining board (standard) L9m×W0.98m~2.30m

3. Oven side links(standard) L18m×W2.3m×H1.2m

4. Oven machine frame(standard) L18m ×W4m×H3m

5. Oven inner conveyer line (standard) L18m×W2.3m×H0.83m

6. Foam block cutter machine (standard) W2.3m×H1.30m(saw/knife with cross type )

8. Total length 33m× width 4m×height 3m

9. Foaming material Group: 13 groups, man-machine interface, automatically computer contro

10. Foaming width 980mm~2250mm

11. Foaming height Max 1300mm

 

MotorGuangdong brand
PumpViking pump & Chinese pump
InvertorSiemens brand
PLCSiemens
TemperatureControl system

 

Material pot types: (The work pressure in the pot is normal pressure)

 

TypeUse

Specification

Qty
Big material tankPPG5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system1
Big material tankPOP5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system

1

 

Big material tankCaCo35m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system1
Big material tankTDI5m³/δ5mm A3 steel plate, with temperature controlling, stirrer, filter system

1

 

Big material tankFlame retardant

2m³/δ3m stainless steel, with filter system

1
Big material tankMC

2m³/δ2mm stainless steel, with filter system

1
Small material tankSi180L/δ1mm stainless steel1
Small material tankA-33180L/δ1mm stainless steel, with filter system1
Small material tankT9180L/δ1mm stainless steel, with filter system1
Small material tankH2O180L/δ1mm stainless steel1
Small material tankColor180L/δ1mm stainless1
Small material tankAnti-yellow180L/δ1mm stainless steel1
Small material tankBlack180L/δ1mm stainless steel1
Floor powder mixing tankPPG, POP, Powder1.5m³/δ3mmA3 steel plate, with filter system1
Filter tankPOP, Powder

1.5m³/δ4mmA3 steel plate

1

 

Remark:The above only for reference. All the data is subjected to sold products.

 

FAQ

 

Q: How many days for the install and testing of the machine?

 

A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

 

Q: For the cost of the engineer how much I need to pay?

 

A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.

 

Q: What kind of raw material tools we need to prepare for the testing?

 

A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.

 

Q: After the machine testing if we need some engineer to stay in our factory can you help to find?

 

A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.

 

Q: During the foaming if we have some problems abt the foam and the machine how can we do?

 

A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.

 

 
 

You are warmly welcome come and visit our factory.

 

under producing machines.pdf

Hot Products

High Rebond And Memory Foam Making Production Line Five Formular Continuous Product Description The ...
Continuous Foam Production Line / Foam Manufacturing Equipment For Mattress ZHMACH Horizontal ...
8~100kg/m3 Density Sponge Continuous Foam Production Line For Mattress ZHMACH Horizontal Continuousl...
Zehui Automatic Long Polyurethane Foam Making Machine Line For Mattress ZHMACH Horizontal Continuous...
Zehui Automatic Long Polyurethane Foam Making Machine Line For Mattress The ZHMACH horizontal ...
8~100kg/m3 Density Sponge Continuous Foam Production Line For Mattress Description of Foam ...