1. Installation
·Extended wire and Tube:
0.3 m^2 four-core cable line (for LED light).
Hydraulic tube (Length is based on the PVC tube and should be long
enoughto connect the hydraulic station).
Electromagnetic valve wire setup (Lifting 1&2 input, Falling
1&2 input).
Get the main body into the pit.
Cable wire and hydraulic tube are connected to ground through the
PVC pipe.
Use PVC pipe to connect the drainage pipe to guide the drainage
process.
2. Power Test, make sure the motor run in clockwise direction(if
otherwise, stop immediately and switch any two live wiresof motor
until it runs in clockwise direction).
Test“ON”“OFF”“STOP”and other functions.
Test foot pedal lifting function, and pressure relief valve
dropping function.
3. Fill in sand and stone into the pit to fix and make it stable and pouring liquid concrete.
4. Once concrete is hardened, installation is finished and device shall be regular using state.
Lift time | 1~3s (Adjustable) |
Down time | 1~3s (Adjustable) |
Length | 3~6m |
Width | 1000mm |
Depth | 760mm |
Lift height | 500mm |
Blade dimension | φ30*90mm |
Material | Q235 Stell (A3 Steel) |
Material thickness | 16/20/25mm |
Color | Green/Black/Red/Yellow |