Home Companies Hebei Hongcheng Pipe Fittings Co., Ltd.

Astm A312 P22 P12 Stainless Steel Pipe Fittings 3 Inch Sandblasting

Hebei Hongcheng Pipe Fittings Co., Ltd.
Active Member

Contact Us

[China] country

Address: Wuliyao Industrial Zone, Yanshan County, Cangzhou City, Hebei Province, China

Contact name:laura

Inquir Now

Hebei Hongcheng Pipe Fittings Co., Ltd.

Astm A312 P22 P12 Stainless Steel Pipe Fittings 3 Inch Sandblasting

Country/Region china
City & Province cangzhou hebei
InquireNow

Product Details

Astm A312 P22 P12 Stainless Steel Fitting Reducing Fitting 2"~14"

ASME SA 234 Gr WP5 Equal and Reduced Tee or Unequal Tee

T-shirts come in 2 forms - equal or reduced t-shirts. While they both resemble the letter T, the difference between them is the way they connect. In ASTM A234 WP5 isopass, the diameter of the connecting branch is the same as the vertical or in-pipe pipe. In the case of reduced or unequal tees, branch pipes have a smaller diameter compared to vertical pipes.

 

Standard

Nominal

Pipe Size

Outside

Diameter

Inside

Diameter

Wall

Thickness T

Center

To End C

Center

To End M

Pipe

Schedule

Weight

Pounds

2-Jan0.840.6220.10911400.35
4-Mar1.050.8240.1131.121.12400.5
11.321.0490.1331.51.5400.75
1 1/41.661.380.141.881.88401.3
1 1/21.91.610.1452.252.25401.9
22.382.0670.1542.52.5403.2
2 1/22.882.4690.20333405.8
33.53.0680.2163.383.38407.2
3 1/243.5480.2263.753.75409.5
44.54.0260.2374.124.124012.7
55.565.0470.2584.884.884020.8
66.626.0650.285.625.624033.1
88.627.9810.322774056.5
1010.7510.020.3658.58.54090.9
1212.75120.3751010*136
141413.250.375111130162
161615.250.375121230206
181817.250.37513.513.5*272
202019.250.375151520350
242423.250.375171720508
303029.240.382222*835
363635.240.3826.526.5*1,294
424241.240.383028*1,495
484847.240.383533*2,300

ASME B16.9 S32205 Duplex Pipe Fittings Dimensions

 

NOMINAL PIPE SIZEALL FITTINGSALL FITTINGSELBOWS AND TEES180 DEG RETURN BENDS180 DEG RETURN BENDS180 DEG RETURN BENDSREDUCERSCAPS
NPSO.D. at Bevel (1), (2)I.D. at EndCentre -to- End Dimension A, B, C, MCentre-to- Centre OBack-to- Face KAlignment of Ends UOverall Length HOverall Length E
(1), (3), (4)
½ to 2½0.060.030.060.250.250.030.060.12
-0.03
3 to 3 ½0.060.060.060.250.250.030.060.12
40.060.060.060.250.250.030.060.12
5 to 80.090.060.060.250.250.030.060.25
-0.06
10 to 180.160.120.090.380.250.060.090.25
-0.12
20 to 240.250.190.090.380.250.060.090.25
-0.19
26 to 300.250.190.120.190.38
-0.19
32 to 480.250.190.190.190.38

 

 

Standards :ASME / ANSI - B 16.9, ASTM A403 - ASME SA403, ASME B16.9, ASME B16.25, ASME B16.28, MSS SP-43.
Size :1/2"NB TO 48"NB IN
Thickness :Schedule 5S, 10S, 20S, S10, S20, S30, STD, 40S, S40, S60, XS, 80S, S80, S100, S120, S140, S160, XXS and etc.
Type :Seamless / ERW / Welded / Fabricated
Form :Equal Tee, Unequal Tee, Barred Tee, Lateral Tee, Reducing Tee.

 

 

Hongcheng is a professional Alloy Steel pipe fittings Alloy Stee pipe manufacturer in China,
We can produce high quality steel pipe fittings,
Tee (Equal Reducing)
Material:
Stainless Steel: ASTM A403 WP 304/ 304L/ 304H/ 316/ 316L/ 317/ 317L/ 321/ 310/ 347/ 904L/ etc.
Carbon Steel: ASTM A234 WPB / A420 WPL3/ A420 WPL6/ MSS-SP-75 WPHY 42/46/52/56/60/65/70 etc.
Alloy Steel: ASTM A234 / WP5/ WP9/ WP11/ WP22/ WP91
Marking:As per request
Packing: Wooden case(Fumigation free) Or as per request
Inspection: In house and third party
Document: MTC EN10204-3.1 can be provided prior to shipment
Surface treatment: Surface galvanized, antirust coating, Epoxy FBE Coating, Electro Polishing,
For further information about our company and products, please visit our website or contact us directly. You will get our 24X7 hour reply by Email, fax or Pohone.

 

 

 

FAQ:

 

  1. Are you a factory or trading company?

  We are a factory.we also have cooperated factory doing other steel business.

  2. How can I get a quotation from you ?

  You can leave us message, and we will reply every message in time. Or we may talk on line by Trademanager.

  And you can also find our contact information on contact page.

  3.Can I get samples before order ?

  Yes, of course. Usually our samples are free. we can produce by your samples or technical drawings.

  4. what is your delivery time ?

  The time of delivery is usually around 20 days(1*20FT as usual).

  We can send out in 2 days, if it has stock.

  5.What is your payment terms?

  Our usual payment term is 30% deposite, and rest against B/L. L/C is also acceptatble.EXW,FOB,CFR,CIF,DDU.

  6.How does your factory do regarding quality control?

  Quality is priority. Our factory has gained ISO9001 authentication. We guarantee the goods out from our factory 100% qualified.

  And Each Process, we have very strict operation and arrange 2 techinians to inspect. After the products are finished,

  we will make the last test to pick up the unqualified products

Hot Products

ATMS A312 3"-14" Sch40 Sch80 Alloy Seamless Steel Pipe Hot Rolled Pipe Description 13CrMo44 ...
ASTM A213 T91 T92 12" Sch40 Alloy Seamless Steel Tube Boiler Tube Alloy Seamless Steel Astm A335 P92 ...
15crmo 12" Sch60 Seamless Alloy Steel Tube Hot Rolled for High Pressure Boiler Introduction Alloy ...
Q235A 12" 14" Sch60 Alloy Seamless Hot Rolled Thick Steel Plate WE SPECIALIZED IN PRODUCING AND ...
Astm A415/X60 Sch40 Medium and High Temperature Alloy Seamless Steel Pipe P91 P22 6"-18" Sch40 ...
Astm A213 Sch40 Sch60 Alloy Seamless Steel Pipe P91 P22 6"-18" Boiler Tube about us: Hebei Hongcheng ...