Hefei Dongsheng Machinery Technology Co., Ltd |
Verified Suppliers
|
|
Multi Functional 120mm Automatic Roll Slitter Servo Motor Driven Paper Slitter Rewinder Machine
This series is a roller coating machine with substantial
protection, safety and optical effects for pet and (b) OPP
substrates.
Two different evaporators are used in different materials to
minimize flexibility while reducing installation time.
Layer deposition was performed based on the thermal evaporation
method. Aluminum and zinc sulfide are the most commonly used
coating materials.
Technical Data
Substrate | OPP 2 - 12um |
Substrate Width | 500-920mm |
Slitting width | min 4.5 mm |
Electricity | 200V 60Hz 3Phase |
Unwinding diameter | max. 650mm |
Winding dia. | max. 350mm |
Speed | max.500m/min |
PLC | Beckhoff Germany |
Operation screen | Colorful touch screen , HMI |
Power supply | AC380V, 50Hz,three phase current |
Competitive Advantages
1. We offer high quality products at competitive price;
2. customs clearance is guaranteed;
3. Good after-sale service;
4. Flexible payment terms;
5. With excellent products and efficient services, we are well
known both at home and abroad.
Packaging & Delivery
1. Prompt delivery;
2. Professional logistic agent;
3. Well-trained and disciplined packing team;
4. After-sale service: Any questions or problems after receiving
the product, please feel free to contact us. Problems would be
solved for you immediately.
Our Factory
FAQ
Q: Is Dongsheng a factory or trading company?
A: Dongsheng is a factory.
Q: Where is your factory located? Can I visit it before I place an order?
A: Our factory is located in Hefei, Anhui,China; Welcome to visit our factory.
Q: Which countries do you mainly exported to?
A: We export to many countries all over the world, such as Germany, Japan, Korea etc.
Q: How about the warranty and after-sale service?
A: We provide 12 months warranty and lifetime technic suport for all machinery.
The response is available within 12 hours while the solution for the troubleshooting is provided within 48 hours.
Q. Payment Terms
A. TT 30% down payment, 70% before shipment.
Q. Machine installation
A. We could assign the technician to the place for the on-site installation if requested by the purchaser.