Home Companies Sichuan Baolida Metal Pipe Fittings Manufacturing Co., Ltd.

Multispan Plastic Film Greenhouse With Drip Irrigation System Plant Nursery Grow Tent

Sichuan Baolida Metal Pipe Fittings Manufacturing Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: No.1,B District of XinDu Industrial Park, JiuLong Road, XinDu District, ChengDu City, Sichuan Province, China

Contact name:Li

Inquir Now

Sichuan Baolida Metal Pipe Fittings Manufacturing Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Multispan Plastic Film Greenhouse With Drip Irrigation System Plant Nursery Grow Tent

Country/Region china
City & Province chengdu sichuan
InquireNow

Product Details

Drip Irrigation System Plant Nursery Grow Tent Multispan Plastic Film Greenhouse

 

 

Description


The plastic film tunnel greenhouse is simple and practical equipment for cultivation or breeding, it is easy to construct, convenient to use. Tunnel greenhouse is widely used in the cultivation of vegetables, fruits and flowers. Tunnel greenhouse can provide the conditions of suitable illumination, moisture and temperature, raising the output and resisting the natural disasters. It can bring forward or backward the provision, remitting the contradictions of provision and demand.

 

 

Optional system

 

NO.ITEMDETAILINCLUDED OR NOT
1Steel structureHot-galvanized steel pipeYES
2Roof coverPO, PE, EVAAccording to clients' requirement
3WallClients can buildBuilt by clients
4Outside shading system

Sunshade net has different light

transmission

According to clients' requirement
5Inner warming system

Install blanket to cover the

greenhouse. It can keep warm.

According to clients' requirement
6cooling systemCooling fans and cooling padAccording to clients' requirement
7Heating system

1.Boiler warming: boiler and water warming blower.

The bolier type has gas boiler, coal boiler, oil boiler and bio fule boiler, and gas/oil boiler.

2. Electric warming: only has electric warming blower

According to clients' requirement
8Ventilation systemTop&side windowAccording to clients' requirement
9Irrigation and fertilization systemdrip irrigation or spray irrigationAccording to clients' requirement
10Light compensating systemHigh - pressure sodium lamp, or LED lampAccording to clients' requirement
11Seadling bed systemUsed for seedingAccording to clients' requirement
12Soilless cultureHydroponic, nutrient, etc...According to clients' requirement
13Power distribution systemcontrol cabinetAccording to clients' requirement
14Other equipmentWe can supply other planting material.According to clients' requirement

 

 

Detailed 


1. Steel structure
The main galvanized frame (The main column according to the wind load and snow load).
2. Roof cover.
The greenhouse film (PE, PVC, EVA, PO) has different thickness (from 80 micro to 200 micro).
3. Ventilation system
There are two types, they are manual and motor ventilation.
4. Cooling and heating system
(1) The cooling system is composed by cooling fan and cooling pad, which can maintain the temperature in the greenhouse at 26-30℃ in summer.
(2) There are two type to heat the temperature, one is to use boiler, other is to use electric.
Boiler fuel can be coal, oil, gas and bio fuels. Boiler need to lay the pipelines and water warming blower to heat.
If using electricity, it needs to use lectric warm air blower.
5. Shading system
Generally, there are outside-inside shading system in this type greenhouse.
6. Irrigation system
There are drip irrigation and spray system to choose.
7. another system
We also can supply light compensating, seadling bed, soilless culture, power distribution and other system that clients need.

 

 

 

Packing & Delivery
1. All the steel material is nude packing.
2. motor and electric machines are put in carton.
3. small steel parts are put in bag.
4. Glass is put in iron frame.
5. All the material is put in containers.

 


Other Greenhouse
Our main products comprise Multi-Span (glass, PC-sheet, plastic film) Greenhouse, Single Span Greenhouse, and Solar Greenhous etc.

 

 

FAQ
1. How long is the delivery time?
The delivery time is from 10 days to 60 days after getting deposit. It depends on the greenhouse size.
2. How long is the warranty period?
We will supply free spare parts if any problem occurred in 12 months after installations.
3. Is your compay foreign trade company or manufacturer?
We are manufacturer.
4. Can you supply sample?
Small parts can be supplied, but clients should pay the express fee.
5. Can your company supply greenhouse design?
Our company can give greenhouse design according to your land

Hot Products

Customized Tunnel Plastic Film Greenhouse Good Stability Greenhouse Product overview: Increase your ...
Customized Tunnel Cover Reinforced Clear Greenhouse Plastic Sheeting Product overview: Increase your ...
4 mil Tunnel Cover Reinforced Clear Poly Sheeting For Greenhouse Product overview: Improve crop ...
Large Mental Material Single Span Tunnel Plastic Greenhouse Uv Resistant Clear Sheeting Product ...
Dome Arch Tunnel Greenhouse 200 Micron Plastic Film Greenhouse Tunnel Greenhouse Product overview: ...
Simplest Structure Hot Dip Galvanized Steel 4m Tunnel Plastic Greenhouse For Plants Growing Tunnel ...