QINGDAO AORUI PLASTIC MACHINERY CO.,LTD1 |
Verified Suppliers
|
|
China Professional Manufacturer Wood Plastic Profile Production Line / Plastic Profile Extrusion Line
Quick detail:
1. Wood Plastic/ PVC Profile/ceiling Production Line
Machine's Introduction:
Needless granulating of materials, mixed with wood powder, the
material can be directly used to extrude wood-plastic profiles.
Suitable material: PVC powder, PVC + wood powder
2. Process Flows:
Plastic(PVC) + additives
high speed heating mixer --WPC granule extrusion line --WPC profile
production line-- finished productsanding/brushing/embossing
surface treatment crusher for recycle
Description:
1. Product Description
It's used to produce PVC profiles with different shape and size for
PVC window, door etc, such as casement series PVC profile, sliding
series PVC profile.
2. Production flow of PVC window door and door profile:
Material mixing, extruding, molding, vacuum calibrating and
cooling, hauling, cutting- final PVC profiles
3. Product Description
1.Plastic Ceiling Machine- PVC/WPC Ceiling/ Window Profile
Extrusion and Making Machine is applied to produce PVC ceiling
panel, PVC wall panel,PVC ceiling tile the hollow board like that
2.This production is composed of conical twin-screw extruder,
vacuum calibration table, haul-off, cutter and stacker.
3.Chang different extruding mould,this machine can also produce PVC
door & window profiles, foamed special shaped materials
profiles, decoration plate material, profile and multi-hole wire
plastic products, etc.
Specifications:
Model | YF120 | YF180 | YF240 | YF300 | YF600 |
Product Max size | 120x50mm | 180x50 mm | 240x100 mm | 300x120 mm | 550x120 mm |
Extruder | SJSZ45/90 | SJSZ51/105 | SJSZ65/132 | SJSZ65/132 | SJSZ80/156 |
Capacity | 120 kg/hr | 150 kg/hr | 300 kg/hr | 300 kg/hr | 400 kg/hr |
Production Length | 18 m | 20 m | 24 m | 24 m | 28 m |
Technical and after-sales service:
The supplier the following technical and after-sales service
commitment
A) Provide on-site installation guide;
B) Responsible for the commissioning of equipment;
C) Responsible for the buyer's personnel mount guard before the
operation and maintenance training;
D) One year free warranty (due to the buyer's improper operation
caused by damage charge costs), and ensure the supply of spare
parts for a long time, only receive the cost.
E) Provide technical advisory services for a long time