Home Companies Foshan Huifeng hydraulic Machinery Co., Ltd.

Pile Driving Excavator Boom Arm 2400kg Telescopic Dipper Arm Excavator

Foshan Huifeng hydraulic Machinery Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: Dashi Industrial Park, Dashi Community, Lishui Town, Nanhai District,Foshan City.

Contact name:yikai tan

Inquir Now

Foshan Huifeng hydraulic Machinery Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Pile Driving Excavator Boom Arm 2400kg Telescopic Dipper Arm Excavator

Country/Region china
City & Province foshan
InquireNow

Product Details

Excavator Long Boom For Pile Driving


Features


Pile driving steel sheet pile, cement pile, steel rail pile, iron plate, H steel
Quick converting operation; Applied to various working environments.
Compared to other systems , less force required for pile pulling
Not damage the top or bottom of steel pipe pile, steel plate pile and steel rail pile.
Not damage the building even often work near it.
Adopted Rubber sheath to reduce noise and vibration, the operation is quiet and the working period is short;It is helpful to overcome environmental problems.
According to the placement direction of sheet pile and site conditions, the sheet pile can be clamped or lowered by positive and negative rotation of 180 °. The vibration frequency can be adjusted by two levels, and the two-level double pumps are combined to greatly increase the excitation force.
Hydraulic motor has small volume and light weight, but it can output high power and high speed.
Vibration frequency can be adjusted by variable pump. It can be used in excavator operation of any brand, and can meet different work requirements only after changing chucks.

 

Description


The pile driver have great adaptability to all kinds of terrians and complicated conditions.Piling boom is widely used in municipal construction, subway, highway and bridge engineering to reinforce the soil to transfer load, so as to ensure that the superstructure will not be deformed anddamaged by the differential settlement of the foundation.

Vibrating pile hammer is using its high frequency vibration to vibrate pile body with high acceleration to pass the vertical vibration of mechanical produce to pile which leading to changes in the soil structure around the pile, strength decrease, soil around the piles become liquefaction to reduce frictional resistance between side of the pile and the soil.
Then using the excavator down force, vibrating pile hammer and pile body weight to sink pile into the soil, when extracting piles, in the condition of vibration to pull out the pile by using excavator lift force.
Excitation force needed by pile driving machinery are comprehensive determined by site soil, soil condition, moisture content and type of pile, construction.
Efficient of vibration pile method is higher than other methods, it is mainly applied to steel sheet pile, steel pipe pile and long slender concrete precast pile within 8 meters.
This pile driving method is the most suitable for working in sand and poorer effect in the clay which must select higher power model machines.

 

Specification

 

ModelLDB120LDB200LDB220LDB300LDB350LDB400LDB450

Total Length(mm)

13000153801538018000200002200024000

Weight(kg)

3000400042005200600065007000

Max Digding Depth(mm)

9000113401137013000150001650018000

Max Extensive Scope(mm)

12500151001510017600196002160023600

Max Digging Height(mm)

11300125101261013720149201610017300

Folding Height(mm)

2900298030403210321034003400

Bucket Volume(m³)

0.30.40.40.40.50.60.6

Excavator Tonnage(ton)

12202230354045

 

 

 

FQA

 

1. ARE YOU A FACTORY OR TRADING COMPANY?

We are a factory based in Guangzhou, China. And we've gained the export certification. Feel free to let our sales know ahead, if you planed for paying a visit to our factory.

 

2. DO YOU ACCPET OEM? WHAT'S YOUR MOQ? ANY EXPERIENCE FOR OEM?

We accept OEM for every product that we produce; There is no MOQ for any of our product if you wanted a OEM; We've been doing OEM ever since the year we established our factory, which is 2010

 

3. IS YOUR DELIVERY ALWAYS ON TIME?

We can't promise about the freight but what we can do is shortening our lead time while keep the same quality level. So there will not be any problem even if the sea freight delay for a couple days.

 

4. WHY DON'T YOU HAVE A CE CERTIFICATIONS?

Ce certification is for one product, not the whole factory, and we have way too many product lines to registered CE for, but our customers from Europe said it's easy to solve the CE problem. And we are working on the CE certifications registration process, in order to save our customers' time in the furture.

 

5. HOW AM I START ORDERING?

First, talk to our sales about your machine medel, working conditions, special needs, deadlines. Then, our sales will provide the details you need. All inquiry will be responed within 24 Hours.

6. CAN YOU KEEP ME UPDATE ABOUT MY ORDERS' PRODUCTION PROCESS?
Of course, unlike others who might hide their production process, our production process are totally open for our customers. Feel free to inform our sales about your needs.

 

Tag: long reach boom, long reach arm, excavator long boom

Hot Products

Guangzhou Huiyi Heavy Industry Machinery Co., Ltd. was founded in 2006, located in Meixing ...
Excavator Excavator Long Reach Stick Boom for Various Models of 75-89Ton Excavators Our long reach ...
Excavator Long Reach Boom Easy Installation With ISO 9001 Certification Long Reach is manufactured ...
19m Long Reach Excavator Booms Custom Color For Sumitomo 490-6 / SH490-6 Long reach front is an ...
Highly Efficient Long Reach Excavator Booms , 14m Long Reach Arm For HITACHI ZX 470 Long reach (arm) ...
Two-Section Excavator Long Reach Boom With Heavy Duty Work Condition 1,We have all the installation ...