Hunan Warmsun Engineering Machinery Co., LTD |
Verified Suppliers
|
|
60323239 Hydraulic Pump Assembly For SANY Crane P3145L00C1C30TA30V50S1B1E For Parker Pump,
Product Details
1. The maximum working pressure of this pump is 300bar. For the
pump with C shaft extension option, the pressure must be reduced to
235bar (3408PSI) under full displacement. When installing this
pump, first check the system pressure and adjust the system or main
valve pressure to a reasonable value. scope.
2. Pay attention to the cleaning of the hydraulic oil and the
cleaning of the iron scraps and iron blocks left by the original
pump valve and other accessories in the pipeline.
3. Do not install the drain port T and the signal port X in
reverse, the oil ports are M12X1.5
4. Torque control options "TA", "TB", "TC" and "TD" Approximate
sensitivity: 450NM (3983INLBS)/turn (360°), that is, the torque
reduction of 1 degree counterclockwise is 125NM, and 10°
counterclockwise Torque reduction is 12.5NM, root
According to the torque you want to reduce, calculate the required
angle. It is recommended to fine-tune the torque every 5° or 10°
angle.
Product Parameters
Product Name | 60323239 Plunger Pump P3145L00C1C30TA30V50S1B1E For Parker Pump For SANY Crane | Brand Name | Warmsun |
Part Number | 60323239 | Model Number | P3145L00C1C30TA30V50S1B1E |
Part Type | Hydraulic Parts | Product Material | steel |
Part Size | 470*450*420 mm | Applicable Industries | Sany crane |
Product Color | Black | Origin | China |
Supply Ability | 10000 pieces a month | Port of Dispatch | Guangzhou |
Part Features | Easy flow adjustment | Samples | yes |
MOQ | 1 piece | Weight | 86 kg |
Product Recommend
10003827 | Iron hinges assembly |
10003834 | Left door assembly |
10003840 | Right door assembly |
10003921 | Pin shaft |
10004845 | steel wire rope cutting sleeve SR220C-05 |
10005618 | Supporting plate |
10005629 | One-way throttle valve body |
10005770 | Power line of electric motor |
10005771 | Enclosing hoop |
10005805 | Primary movable leg assembly |
10005852 | Vertical Outrigger Oil Cylinder |
10005862 | Secondary front movable leg assembly |
10005863 | Secondary rear movable leg assembly |
10005871 | Limit Stop |
10005924 | Condenser retaining plate |
10005925 | Fixed plate of condenser II |
10005985 | Signal lamp assembly |
10006051 | license plate bracket HQC5290JB.50-26 |
10006090 | One-Way Throttle |
10006628 | Chassis nameplate HQC5290JB.24-1A |
10006671 | Nameplate QY26A.21A-1 |
10006673 | Superstructure lubricating point name pl |
10006674 | Left outrigger operating name plate |
10006675 | Explanatory nameplate for outrigger cont |
10006698 | Belting, rubber |
10006699 | Decal, Caution, Oil Level QY17A.38-2 |
10006702 | Superstructure lubricating point name pl |
10006719 | Fastening Strap |
10007967 | Pipe connector |
10007972 | Support, Filter |
10008057 | Fuel Tank BodyQY17A.38A.1 |
Packing and Shipping
For parts, a plastic bubble film and a cardboard box are provided to pack goods, which is easy to transport and helps to keep the products intact during transportation.
For leadtime, 10000 pieces are produced per month, which is a large stocks.
For shipping time, every goods will be sent to customers in time. Although shipping time is up to express company, we know an approximate time from different express company, and we will count it into the delivery time. So, our customers could get a precise deadline.
FAQ
Q1: Are you trading company or manufacturer?
A: Our management is focused on exporting activities for more than
ten years and we have our own bushing factory. Warmsun is always
professional and reliable. Our advantages are multiple resource
integration, strong quality assurance and excellent service level.
We are always responsible for our products.
Q2: Hong long is your delivery time?
A: It depends on the quantity. For a big order, the time is
generally 10-25 days after order. For a small order, customers can
get goods at once.
Q3: Do you produce samples? Is it free or extra?
A: For standard products, we produce samples free of charge for our
customers. And the express costs will be burdened by the customer,
but can be returned after the order is placed. For some goods that
are inconvenient to transport, the express costs will be burdened
by the customer
Q4: How to ensure the quality?
A: We produce as per the confirmed technology or drawings for each
order for our customers. And our factory has a strict quality
control system. We inspect goods during production according to a
certain frequency and we also perform the final inspection before
the goods are packed.