Guangzhou XinFeng Engineering Machinery Co., Ltd. |
Verified Suppliers
|
|
Pos. | Part No | Qty | Parts name | Comments |
1 | 7Y-1434 | [1] | SPACER (40X69.5X6-MM THK) | |
2 | 096-1773 B | [1] | SHIM (0.15-MM THK) | |
096-1774 B | [1] | SHIM (0.3-MM THK) | ||
096-1775 B | [1] | SHIM (0.4-MM THK) | ||
096-1776 B | [1] | SHIM (0.5-MM THK) | ||
096-1777 B | [1] | SHIM (0.6-MM THK) | ||
096-1778 B | [1] | SHIM (0.7-MM THK) | ||
096-1779 B | [1] | SHIM (0.8-MM THK) | ||
096-1780 B | [1] | SHIM (1-MM THK) | ||
096-1781 B | [1] | SHIM (1.6-MM THK) | ||
3 | 114-1485 | [1] | HOUSING-MOTOR | |
4 | 114-1497 | [1] | SEAL GP-DUO-CONE | |
5 | 096-6412 | [2] | BALL BEARING | |
6 | 114-1486 | [1] | HOUSING | |
7 | 114-1539 | [4] | PIN-DOWEL | |
8 | 7Y-1436 | [1] | GEAR-COUPLING | |
9 | 6D-0692 | [1] | SEAL-O-RING | |
10 | 7Y-1433 | [1] | CARRIER | |
11 | 6V-5686 M | [16] | BOLT (M16X2X50-MM) | |
12 | 7Y-0223 | [3] | SHAFT-PLANETARY | |
13 | 094-1542 | [6] | BEARING-ROLLER | |
14 | 7Y-1431 | [3] | GEAR-PLANETARY (30-TEETH) | |
15 | 094-1528 | [6] | WASHER (53X84X1-MM THK) | |
16 | 095-0891 | [6] | PIN-SPRING | |
17 | 7Y-1428 | [3] | GEAR-PLANETARY (32-TEETH)(32 TEETH) | |
18 | 094-0616 | [3] | BEARING AS-ROLLER | |
19 | 3E-2338 | [2] | PLUG-PIPE | |
20 | 7M-8485 | [2] | SEAL-O-RING | |
21 | 7Y-1426 | [1] | COVER | |
22 | 7Y-0225 | [3] | SHAFT-PLANETARY | |
23 | 094-0611 | [6] | WASHER (47.3X76X1-MM THK) | |
24 | 094-0580 | [1] | PLATE (10-MM THK) | |
25 | 7Y-1427 | [1] | GEAR-SUN (14-TEETH)(11 TEETH) | |
26 | 7Y-1430 | [1] | GEAR-SUN (17-TEETH) | |
27 | 7Y-1558 | [1] | SPACER (90X119.6X7.5-MM THK) | |
28 | 7Y-1432 | [1] | CARRIER | |
29 | 7X-2568 M | [16] | BOLT (M20X2.5X180-MM) | |
30 | 8T-4123 | [16] | WASHER (3.62X5.75X0.375-MM THK) | |
31 | 1U-8846 B | SEALANT-GASKET | ||
32 | 095-1270 M | [2] | SETSCREW-SOCKET (M12X1.75X30-MM) | |
33 | 7Y-1631 | [1] | GEAR-RING | |
B | USE AS REQUIRED | |||
M | METRIC PART |
Undercarriage spare parts: | Track shoe, Track Link, Bolt, Track roller, Carrier Roller,
Sprocket, Front Idler, Idler Cushion ...... |
Engine spare parts: | Engine assy,Cylinder Head,Cylinder Block,Turbocharger,Piston,
Piston Ring, Metal, Crankshaft, Oil Pump, Fuel injection Pump,Water Pump, Alternator, Starting Motor ...... |
Hydraulic spare parts: | Main Valve, Main Pump, Solenoid Valve, Boom/Arm/Bucket Cylinder,
Final Drive, Travel Motor, Swing Machinery, Swing Motor ...... |
Operator's Cab spare parts: | Cab Assy, Monitor, Controller, Engine Controller, Wiring Harness,
Seat, Air Conditioner, Air Compressor...... |
Cooling parts: | Radiator, heat sink, air conditioner, compressor, after cooler ,
water cooler hydraulic oil cooler ...... |
Other parts: | Service kit, swing circle, engine hood, swivel joint, fuel tank,
filter, boom, arm, bucket |
About Xinfeng Machinery (XF) parts:
Maintenance method
1. The lubricating oil maintenance cycle of the rotary motor is
1000 hours. In daily operation, we need to observe the amount of
rotary lubricating oil from the dipstick. In some cases, abnormal
loss of lubricating oil will be found, so we need to open the large
ring gear window. Check whether lubricating oil leaks into the
large ring gear cavity through the sealing ring.
2. The general rotation gear inspection and lubricating oil
replacement cycle is every 2000 hours or one year. The butter
filling amount for a 20-ton machine is about 36 liters (two
barrels). Periodically open the boom base and the square cover on
the front of the frame. , to check the ring gear and lubrication
conditions. For maintenance or if water is found, go to the X
overhead cavity at the bottom of the excavator and open the cover
to release the water.
3.There is a common misunderstanding among customers about the
maintenance of slewing bearings. They believe that the lubricating
oil of the slewing bearing is the same as the lubrication cycle of
the big and small arms, and they need to be lubricated every day.
In fact, such actions have the opposite effect. If the lubrication
cycle is too short, there will be too much lubricating oil in the
bearing, which will burst the dust ring and leak out.
Service
1. Consulting services: Provide professional opinions and
suggestions to help customers solve business problems and formulate
strategic plans.
2. Query service: Customers provide part numbers and we can
accurately query the exploded view and model.
3. Technical service: Engineers can solve all problems related to
the excavator, determine component failures, and then tell
customers how to solve the problem.
Advantages
Warehouse Display
Packaging and Delivery
FAQ
1. How to quickly and accurately buy products what lneeded?
A: Provide the original parts number to us to check.
2. How long have you been in the excavator
A: We are engaged in excavator parts since 1998
3. lfI don't know the part number,what shouldI do?
A: Please send us size and pictures of old products.
4. What is the warranty of the products?
A: The warranty is 6/12 Months based on the specific product.
5. How long is your delivery time?
A: The normal delivery time is 3-5 days for stock sproductsafter
getting payment. lf not in stock, we will inform you thetime
requlred.
6. Which shipping term you can supply?
7. What is your MOQ?
A: Small order and sample order are acceptable
8. Do you have any After-Sales service?
A: Yes!Our