Hangzhou fuyang lefan machinery co.,ltd |
|
heat treatment.
steam pressure, thus resulting in shorter cycle time.
moulding machine in a total and even way, fast, strong, and energy saving.
Technical data:
Subjects | Unit | JC-ⅢC-2000 | JC-ⅢC-3000 | JC-ⅢC-4000 | JC-ⅢC-6000 | JC-ⅢC-8000 | ||
Mould size | mm | 2040×1030× | 3050×1240× | 4070×1240× | 6110×1240× | 8120×1240×640 | ||
Product size | mm | 2000×1000× | 3000×1200× | 4000×1200× | 6000×1200× | 8000×1200×600 | ||
| Inlet size | mm | φ100 | φ100 | φ150 | φ150 | φ150 | |
Consumption | Kg/cycle | 20-30 | 30-40 | 40-55 | 50-70 | 60-90 | ||
Inlet pressure | Mpa | 0.6-0.8 | 0.6-0.8 | 0.6-0.8 | 0.6-0.8 | 0.6-0.8 | ||
Compressed air | Inlet size | mm | φ40 | φ40 | φ50 | φ50 | φ50 | |
Consumption | Kg/cycle | 1-1.5 | 1.5-1.8 | 1.8-2 | 2-2.3 | 2.2-2.5 | ||
Inlet pressure | Mpa | 0.6-0.8 | 0.6-0.8 | 0.6-0.8 | 0.6-0.8 | 0.6-0.8 | ||
Injector | Entry number | pc | 4 | 6 | 8 | 12 | 16 | |
Entry size | mm | 60 | 60 | 60 | 60 | 60 | ||
Drainage size |
| φ80 | φ80 | φ100 | φ100 | φ100 | ||
Main drainage size |
| φ150 | φ150 | φ200 | φ200 | φ200 | ||
Cycle time | 15g/L | Min/ cycle | 6 | 7 | 8 | 9 | 9 | |
Blower power | KW | 4 | 4 | 5.5 | 7.5 | 11 | ||
Power | Capacity | KW | 9.5 | 9.5 | 13 | 13 | 13 | |
Consumption | KW/h | 5 | 5 | 6.5 | 6.5 | 6.5 | ||
Overall dimension | MM | 4300×2800× | 5300×2800× | 6800×2800× | 8800×2800× | 11000×2800×2600 | ||
Weight | T | 7 | 8.5 | 9.8 | 11.5 | 14.5 |