High Capacity Ground Installation Tilt Mount Solar Ground System For Home Use 5kw Solar Power System
Product parameters
Model | | | |
Half Cut Mono 550W Solar Panel | | | |
PV Combiner Box | | | |
Off-Grid Hybrid Inverter | | | |
GEL Battery | | | |
DC Cable 4mm2 | | | |
MC4 Connector | | | |
Mounting System | Customized Product Based On Installation Roof/Ground |
PV Installation Tools | Wire Cable Cutter & Stripper, Disassembly Tool |
Model | | | |
Half Cut Mono 550W Solar Panel | | | |
PV Combiner Box | | | |
Off-Grid Hybrid Inverter | | | |
GEL Battery | | | |
DC Cable 4mm2 | | | |
Mounting System | Customized Product Based On Installation Roof/Ground |
PV Installation Tools | Wire Cable Cutter & Stripper, Disassembly Tool |
Note:
>All of equiipments has warranty.
>Reliable after sale sevice during warranty period,replace or repair all parts.
>Product dimensions and physical appearance in this data sheet are nominal.
>Solar reserves the right to make the product changes from time to time.
![](http://img.everychina.com/nimg/c4/b9/68032ec89713da4e06403970ec65.jpg)
Company Profile
Guangzhou Pei Mengdan new energy Technology Co., LTD is a Hi-Tech company.We are a vertically integrated company in designing, engineering and manufacturing products and solutions for needs of today and future.Our ambition is to be unparalleled in meeting our customers' needs for green, smart, high-efficiency power solutions & reliable backup solutions that reduce energy consumption and the impact on the environment.
FAQ
Q1: Can I get the pre-production sample?
A1: Yes, we will send you sample for approval first, after you confirm, then we will start mass production order.
Q2: Can battery size customized available?
A2: Yes, please send up the capacity and max battery size, so that we can search our model for you.
Q3: How to proceed an order?
A3: Firstly, let us know your requirements or application. Secondly, we quote according to your requirements or our suggestions.Thirdly customer confirms the samples and places deposit for formal order. Fourthly we arrange the production.
Q4: What about the lead time?
A4: Sample needs 7-12 days, mass production time needs negotiation.
Q5: Do you have the documents required for battery shipments?
A5: Yes, we have MSDS, UN38.3, etc. and other special files needed for shipments to some regions can also be secured.