Dongguan chengkang mold plastic co., ltd |
|
Aluminum Handle Plastic Tube Plug Left Plastic Injection Molded Parts
Name | Aluminum Handle Plastic Tube Plug Right Parts Plastic Injection Molded Parts |
Core Material | High hardness alloy steel with heat treatment, wear resistance, corrosion resistance |
Plastic Material | ABS |
Mold Equipment | CNC, EDM, precision grinder, milling machine, driller, wire |
Products Color | White |
Mould Weight | 4g |
Mould Life | 300k-500k shots/2 years |
Mould Precision | +/-0.05mm |
Application Area | Plastic Injection Molded Parts |
QC Equipment | Quick checking tools |
Delivery Time | 4-8 weekends |
Package Method | Mold by wooden box, products by carton. As you required |
Export Port | Shenzhen port |
Why choose us?
First-rate facilities:
Mould Machine: 2 Mould Machines,4 EDM Machines,1 High Speed CNC Carving and Milling Machine,
7 Milling Machines and 3 Grinding Machines
Plastic Injection Machine:10 Plastic injection molding machine,6 Precision injection molding
machine
Professional Working Team:
Mould Desin Department: We have a R&D Team including more than
5 engineers with excellent design
abilities over 20years.
Mould Production Department: Over 10 experiened workmen in charge
of our factory's mould production.
Plastic Injection Production Department:1 supervisor,2 workshop foreman,2 QC,1 material purchaser and group of worker
to produce and self-check plastic injection products.
Office: Over 10 experiened employees in charge of our company work affair.each one
is
responsible for specialized job.
Strict quality control systems
Factory price
FAQ
Q:What do your company mainly produce?
A:As a plastic mould company,we can produce kind of parts with plastic,like,plastic injection molded parts,ABS plastic injection parts,etc
Q:What kind of project do your company made?
A:We have worked with many international enterprices,so we made a lot of projects with them,such as,the gift box of Bently,The shoes box logo of YSL,the glasses tray of Zeiss,etc.
Q:How long does it take to get products?
A:We need 25-30 days to produce plastic parts and mould,and we need 7-14 days to deliver the products to clients.
Q:What would you do with the unqualified products?
A:We would take responsbilies of the unqualified products which were unqualified under production