Home Companies Jinzhou City Shitan Machinery Equipment CO. LTD.

300M Water Well Drilling Rig Machine Deep Underground Wheels Mounted

Jinzhou City Shitan Machinery Equipment  CO. LTD.

Contact Us

[China] country

Trade Verify

Address: Xiaoshang Village,Jinzhou City,Hebei province,China

Contact name:Anna

Inquir Now

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

300M Water Well Drilling Rig Machine Deep Underground Wheels Mounted

Country/Region china
City & Province jinzhou hebei
InquireNow

Product Details

300 Meters Deep Underground Wheels Mounted Water Well Drilling Rig Machine​

 

 

GY 200 Water Well Drilling Machine Introduction:

 

300 meters ,hole diameter 300 mm , is suited for the geotectonic survey, geological core drilling, small hole drillings for grout, blast and water well in railway, water coservancy, bridge, dam foundation and other constructions. Diamond drill vit, alloy drill bit and steel roller drill bit are available for drilling according to different geological structures.

 

GY 200 Water Well Drilling Technical Details:

 

Drilling depth60-295m
Drilling diameter300mm 76 46mm
Drill pipe diameter50 42mm
Spindle Turnable Angle0-360degree
Net weight(excluding the power machine)670kg
Dimension(length*width*height)1820*980*1400mm
Revolving Plate
Spindle speed900 475 388 205 157 68 r/min
Maximum torque2000N*m
Driving travel400mm
Maximum Cylinder driving force2,9000N
Maximum Cylinder lifting force3,9000N
Lifter
Lifting capacity3,0000N
Bobbin line speed (2 layers)0.27 0.64 0.83 1.58 1.64 m/s
Bobbin diameter135mm

 

GY 200 Water Well Drilling Technical Features

 

Drilling rig is mainly used for geological general investigation and exploration,road and tall buliding foundation exploration,kinds of hole in concrete structure,river levees,subgrade grouting hole,drilling and driect grouting,civil wellsand earth temperature central air-conditioner,etc

is mainly used for geological general investigation and exploration,kinds of hole in concrete structure,road and tall building foundation exploration,river levees,subgrade grouting hole drilling and direct grouting,civil wells and earth temperature central air conditioner,etc

 
GY 200 Drilling Rig Geological Survey:
 
It can be divided into: (1) geophysical exploration: lithology, groundwater level, karst cave distribution, etc. are divided according to the conductivity, magnetism, density and the propagation speed of elastic wave in different underground strata and media (water, cavity, rock, etc.). Guide drilling. (2) Drilling: combined with pit (groove) exploration. 3) penetration: it is both an exploration method and an in-situ test method.

Drilling consists of sinking a drill string into the ground while injecting a special mud. This allows fragments of rock and samples of gas to be brought back to the surface. Boreholes have to be drilled at several locations to delineate the potential deposit.

 

Prevention of drilling hole collapse

 

The preventive measures for hole collapse should first meet two conditions: mud liquid column pressure = technological pore pressure; Minimize water infiltration into the rock and soil or water seepage around the hole wall.

Preventive measures for hole collapse caused by geological factors include:

(1) Increase the mud density and increase the mud liquid column pressure to balance the formation pressure;

(2) Use a larger ratio of mud to plastic to protect the hole.

Preventive measures for hole collapse caused by physical factors include:

(1) Start the pump too fast and keep the drill pipe working under constant tension as far as possible to avoid the sudden increase of liquid column pressure and the violent impact of drilling tools on the hole wall;

(2) According to the distribution of underground obstacles, the drilling track design and reaming procedure shall be well done to avoid the rotary extrusion of the drilling tool on the hole wall caused by the excessive curvature of the guide hole;

(3) Reasonably control the mud density and rheological properties, make the mud have a certain liquid column pressure, and maintain the low return velocity of the mud,

 

 

Hot Products

Water Well Borehole Machine Agricultural Irrigation ST 260 Drilling Rig ST 260 Borehole Drilling ...
400 Meters Deep Underground Hole Blasting Water Well Drilling Rig Machine For Business ST 400 Water ...
Water Well Borehole Machine ST 260 Drilling Rig ST 260 Borehole Drilling Machine Description This ...
18 HP GK 200 Portable Water Well Drilling Rig Machine For Deep Borehole Engineering Product ...
Portable Hydraulic 200 Meters Mine Borehole Water Well Drilling Rig Machine Product Description 200 ...
ST 300 Water Well Drilling Rig Machine DTH Blasting Product Descrption ST 300 drilling rig is ...