Home Companies Jinzhou City Shitan Machinery Equipment CO. LTD.

200 Meters Borehole Drilling Machine Crawler Mounted For Deep Underground Water

Jinzhou City Shitan Machinery Equipment  CO. LTD.

Contact Us

[China] country

Trade Verify

Address: Xiaoshang Village,Jinzhou City,Hebei province,China

Contact name:Anna

Inquir Now

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

200 Meters Borehole Drilling Machine Crawler Mounted For Deep Underground Water

Country/Region china
City & Province jinzhou hebei
InquireNow

Product Details

200 Meters Crawler Mounted Durable Fast Speed Deep Water Borehole Drilling Rig Machine

 

 

ST 200 Borehole Drilling Rig Description:

 

The pneumatic dth drilling rig mainly drilling rock must connect with air compressor . it has fast drilling speed ,pneumatic dth drilling rig can drill 20-40m per hour . high drilling effective .the engine it is 63kw ,more powerful .pneumatic water borehole drilling rig it has 4 high hydraulic leg which can lifting 1.6m height can easy loading on the truck .

 

ST 200 Borehole Drilling Rig Parameters:

 

Drilling Rig ModelST-200
Weight5.8T
Bore diameter140-305mm
Drilling depth200m
Stroke3.4m
Travelling speed2.5km/h
Gradeability30%
Power65-70KW
Rated pressure1.7-3.0mpa
Air consumption17-30m³/min
Drill rod diameterΦ76, Φ89
Drill rod length1.5m 2.0m 3.0m
Elevating capacity15T
Swing speed45-70rpm
Swing torque3500-4800N.M
Dimensions

4000*1750*2450mm

 

 

ST 200 Borehole Drilling Rig  Advantages:

 

1.compact design for easy use
2.160meters drilling and 30m/h drilling speed
3.Track all terrain chassis ,durable and stable .
4.Double hydraulic power head more powerful ,the drill speed faster and drill diameter more big .
5.High power engine and integrated operation.

 

ST 200 Borehole Drilling Rig Service:

 

Before sales: Engineering Consultance Service & Technical Support;
After sales: Process clients' feedback and or problems during the operation of the machines within 24 hours;
OEM service: We accept OEM orders and 70 percent of our clients are enjoying OEM services;

 

What should we pay attention to in hydro power projects?

 

1. The safety of the water well drilling rig must be checked. All parts must be complete without leakage of cables, drill pipes, drill bits, etc.

2. The drill should be loaded firmly, turn or bend the road, fix the steel wire and fix it;

3. When entering the construction site, the drilling rig should be fixed, the drilling area should be larger than the water well drilling rig, and there should be enough safety space around;

4. When drilling, the drilling position, direction, angle and depth must be strictly followed, and the drill bit must not be modified without authorization;

5. When installing the drill pipe, check the drill pipe to ensure that the drill pipe is not blocked, bent, and the steel wire is not worn. It is strictly forbidden to unqualified the drill pipe;

6. When loading and unloading the drill bit, strictly prevent the pipe clamp from clamping the cemented carbide parts, and it is strictly prohibited to prevent the flat drill bit and core pipe.

 

 

 

 

 

 

Hot Products

Water Well Borehole Machine Agricultural Irrigation ST 260 Drilling Rig ST 260 Borehole Drilling ...
400 Meters Deep Underground Hole Blasting Water Well Drilling Rig Machine For Business ST 400 Water ...
Water Well Borehole Machine ST 260 Drilling Rig ST 260 Borehole Drilling Machine Description This ...
18 HP GK 200 Portable Water Well Drilling Rig Machine For Deep Borehole Engineering Product ...
Portable Hydraulic 200 Meters Mine Borehole Water Well Drilling Rig Machine Product Description 200 ...
ST 300 Water Well Drilling Rig Machine DTH Blasting Product Descrption ST 300 drilling rig is ...