Home Companies Jinzhou City Shitan Machinery Equipment CO. LTD.

ST 400 Farming Blasting Water Borehole Drilling Machine For Deep Underground Drilling

Jinzhou City Shitan Machinery Equipment  CO. LTD.

Contact Us

[China] country

Trade Verify

Address: Xiaoshang Village,Jinzhou City,Hebei province,China

Contact name:Anna

Inquir Now

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

ST 400 Farming Blasting Water Borehole Drilling Machine For Deep Underground Drilling

Country/Region china
City & Province jinzhou hebei
InquireNow

Product Details

Farming DHT Blasting Deep Water 400 Meters Borehole Drilling Machine

 

 

ST 400 Borehole Drilling Machine Information

 

ST 400 is with 400 meters depth ,suitable for geothermal air conditioning holes and other wells, especially suitable for water intake projects in mountainous areas and rock formations,this rig can both work with mud pump and air compressor .

 

ST 400 Borehole Drilling Machine Main Technical Data

 

Product NameST 400

Max drilling depth
400 Meters

Drilling diameter
105-325 mm

Air pressure
1.2-3.5mpa

Rod length
3 meter

Rod diameter
89-102-114mm

Main shaft pressure
5T

Lifting force
25T
Power head stroke6.6M

Max rotary torque
12000Nm

Max rotary speed
100r/ rmin

Secondary winch liftng force
3T

Jacks stroke
1.5m

Moving speed
2.5km/h

Uphill angle
21°Slope

Weight of the rig
8.8T
The engine92KW / 6 cylinder

Overall dimensions
3900*1600*2350mm

Working condition
Loose layer and bedrock

Drilling method
Hydraulic rotary, down-the-hole impactor

 

ST 400 Borehole Drilling Machine  Advantages

 

1. The drilling rig hydraulic transmission of the rig effectively utilizes the power. This makes the overall power loss small and the drilling cost low.

2. The drill rig has more positive speed stages and 14-500r / min speed range, and the output torque is 13428-250N.m.
3. The drilling rig has 2 reverse speeds, which is convenient for handling accidents.
4. The air compressor drilling rig adopts a long-stroke double-speed mechanism, a mechanical power head, and a power head stroke of 3400MM to improve drilling efficiency and reduce the occurrence of plugging and burning accidents.
5. The water well drilling rig rig uses dual oil pumps for oil supply. A single pump is used for drilling, and a double pump is used for confluence when lifting. The power loss is small and the auxiliary time is short.
6. The drilling rig machine has advanced structure and reasonable layout, which is convenient for maintenance, maintenance and repair.
7. The crawler water drilling rig machine chassis is adopted, and the trip of the outrigger
cylinder can be automatically loaded for 1.5m, which is convenient for relocation and transportation.
8. The drill rig reserves some functional interfaces in the hydraulic system, and can expand the functions according to the technological requirements of different users.
 

What is the construction technology of de watering well?

 

Well point measurement and positioning → hole digging and casing embedding → drilling rig in place → drilling → hoisting well pipe → back-filling filter material (coarse sand or gravel) between well pipe and hole wall → hole washing → drainage pump in well pipe and installation of pumping control circuit → trial pumping → normal operation of well point → de watering completion, pipe pulling → well sealing.

 

Why is the water well drilling rig not suitable for use in rainy days?

 

After the well is completed, it is necessary to pump water to check the results. Under normal circumstances, a large draw down pumping can be done. The stable duration of the water level shall not be less than eight hours, and the water flow of the dynamic water level of the well shall be measured at the same time. The well drilling project shall ensure the smooth drainage of the construction site, so the rainy season shall be avoided. When working while excavating, the excavation slope shall be determined according to the physical and mechanical properties of the soil layer, generally 1:1.5, and there shall be a certain distance from the toe of the spoil slope to the upper opening of the excavation. For large wells with water inflow from the shaft wall, the water inlet hole and inverted filter layer of the shaft wall must be arranged according to the design requirements, and the water inlet hole shall be prevented from being blocked during construction. The filter material enclosure at the aquifer shall meet the requirements, the backfill shall have a certain super elevation, and the frozen soil in the backfill in winter shall not exceed 15%.

 
 
 

 
 

 

 

 

Hot Products

Water Well Borehole Machine Agricultural Irrigation ST 260 Drilling Rig ST 260 Borehole Drilling ...
400 Meters Deep Underground Hole Blasting Water Well Drilling Rig Machine For Business ST 400 Water ...
Water Well Borehole Machine ST 260 Drilling Rig ST 260 Borehole Drilling Machine Description This ...
18 HP GK 200 Portable Water Well Drilling Rig Machine For Deep Borehole Engineering Product ...
Portable Hydraulic 200 Meters Mine Borehole Water Well Drilling Rig Machine Product Description 200 ...
ST 300 Water Well Drilling Rig Machine DTH Blasting Product Descrption ST 300 drilling rig is ...