Home Companies Jinzhou City Shitan Machinery Equipment CO. LTD.

180 Meters Deep Underground Large Borehole Drilling Machine ST 180

Jinzhou City Shitan Machinery Equipment  CO. LTD.

Contact Us

[China] country

Trade Verify

Address: Xiaoshang Village,Jinzhou City,Hebei province,China

Contact name:Anna

Inquir Now

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

180 Meters Deep Underground Large Borehole Drilling Machine ST 180

Country/Region china
City & Province jinzhou hebei
InquireNow

Product Details

180 Meters Deep Underground Large Borehole Drilling Machine ST 180

 

 

ST 180 Meters Crawler Mounted Drilling Rig Information:

 

This kind water well drilling rig uses full hydraulic control,very high drilling efficiency.Light weight ,portable ,and high drilling rocky drilling 90-254mm hole diameter ,air and water both drilling no problem.Water well drilling rig machine is our hot sale products and has a very good reputation in our customers, the theory designed drilling depth is 100- 600 meters.

 

ST 180 Crawler Mounted Drilling Rig Tech Data:

Product Name

ST 180 drilling rig

Drilling hole diameter

95-254mm

Drilling depth

180m

One-time advance length

3.3m

Walking speed

2.5km/h

Climbing angles (Max.)

30

Equipped capacitor

55kw

Using air pressure

1.7-2.5mpa

Air consumption

17-31m³/min

Drill pipe length

1.5m, 2.0m, 3.0m

Drill pipe diameter

76mm, 89mm

Rig lifting force

14 MT

Swing speed

45-65rpm

Swing torque

3200-4600(N.m)

Dimension

3800*1500*2200mm

Weight

4500kg

 

ST 180 Borehole Drilling Machine Applications

 

This series of water well drilling machine has the characteristics of standardized configuration, compact and reasonablestructure, fast drilling speed, economical and durable, low failure rate, etc. It has been recognized by the market once it islaunched, and has been widely used in mining engineering construction, civil drilling, geothermal drilling and other fields.

 

What Aspects Should We Pay Attention To In Water Well Drilling?

 

After the drilling structure of the drill bit of the water well drilling rig is drilled, the central drilling tool needs to be replaced in time. First, the hole bottom needs to be cleaned, and then the residue at the hole bottom needs to be blown away. After the drill bit stops rotating, the drilling tool in the water well drilling rig can be lifted up slowly. When the lifting force is just enough to lift the drilling tool, it is the most appropriate.

 

What is the reason for the high oil temperature in the drill

 

The high temperature in the drilling rig is generally divided into the high temperature of the gearbox, the high temperature of the hydraulic oil, and some are the high temperature of the engine cooling liquid. In fact, the reason for the high temperature of the gearbox is very simple. The main reason is that the size and shape of the bearing or gear and housing are not standard or the oil is unqualified. Now let's give you a detailed analysis.

Hydraulic oil temperature is too high:

First of all, the temperature of hydraulic oil is too high. According to hydraulic theory and maintenance experience in recent years, the main reason for the high temperature of hydraulic oil is too fast heat generation and too slow heat dissipation. The oil inlet pipeline and hydraulic oil tank of the hydraulic pump are not sealed tightly, the oil inlet filter element is blocked, the hydraulic system pipeline is not unblocked, and the internal leakage of the hydraulic pump will cause a large amount of heat to be generated in the hydraulic oil, so that the temperature of the hydraulic oil will rise rapidly due to excessive heat generation.

The internal channel of the hydraulic oil radiator is blocked, the external dust of the radiator is too large, the wind force is not enough, and the hydraulic oil does not pass through the hydraulic oil radiator, which can lead to the high temperature of the hydraulic oil due to the slow heat dissipation

 

 

 

 
 
 

Hot Products

Reciprocating For Water Well Drilling And Exploration BW 250 Drilling Rig Mud Pump BW 250 Mud Pump ...
BW 250 Triplex Mud Pump Grouting Horizontal Slurry Drilling Mud Pump BW 250 Mud Pump Product ...
BW 150 Mud Pump Cement Injection For Drilling Water Borehole And Exploration BW 150 Mud Pump Product ...
BW-150 High Pressure Triplex Piston Concrete Pump For Drilling Rig BW 150 Mud Pump Product ...
BW 150 Mud Pump Cement Injection For Drilling Water Borehole And Exploration BW 150 Mud Pump Product ...
BW - 160 / 10 Triplex Piston Mud Pump Optional Model For Drilling Rigs Product Description BW160/10 ...