Home Companies Jinzhou City Shitan Machinery Equipment CO. LTD.

Gold Mining GK 200 Customized Soil Testing Drilling Rig

Jinzhou City Shitan Machinery Equipment  CO. LTD.

Contact Us

[China] country

Trade Verify

Address: Xiaoshang Village,Jinzhou City,Hebei province,China

Contact name:Anna

Inquir Now

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Gold Mining GK 200 Customized Soil Testing Drilling Rig

Country/Region china
City & Province jinzhou hebei
InquireNow

Product Details

Gold Mining Drilling Rig GK 200 Customized Soil Sample Testing Drilling Rig

 

 

GK 200 Soil Testing Drilling Rig Product Information:

 

GK-200 Drilling Rig with hydraulic feeding is widely utilized and featured in high power and hoisting load(2T), large torque transmission, etc. The rotating speed of vertical hexagonal spindle varies between 71r/min-825r/min. 

 

GK 200 Soil Testing Drilling Rig Technical Data:

 

Drilling Rig
Drilling diameter(mm)75,91,110,130,150,300
Drilling depth (m)200,150,100,70,50,30
Drill pipe diameter (mm)42,50
Drilling angle(°)90~75
Equipment size(L * B * H)1730 * 860 * 1360 (mm)
Rig weight (except engine)700
Gyrator
Spindle speed (four gear) (r/min)115,230,505,1010
Spindle travel(mm)450
Spindle no-load lifting maximum moving speed(m/s)0.05
Spindle no load drop maximum movement speed(m/s)0.067
Spindle maximum feed pressure(KN)15
Spindle maximum lifting force(KN)25
Spindle maximum output torque(KN• m)1.5
Winch assembly
Winch maximum lifting force (single rope)20
Reel speed (r/min)20,39,85,170
Reel circumferential speed(m/s)0.172,0.345,0.738,1.476
Reel diameter(mm)140
Wire rope diameter(mm)9.3
Wire rope density (m)40
Brake diameter(mm)278
Brake band width (mm)50
 
 


GK 200 Soil Testing Drilling Rig Features:

 

1. With hydraulic automaatic feeding device, elevated drilling efficiency.

2. Large torque and drilling diameter.

3. With a spherial jaw holding mechanism and the rod replacement without breakdwn, high efficiency.

4. Compact structure, small volume, lightweight, high detachability, easy transportation and suitable for the operations in plains or mountain areas.

5. Adoping large drive pipe, double guide rod, increase the stability.

 

GK 200 Soil Testing Drilling Rig  FAQ:

 

We Shitan Machinery is a professional drilling rig manufacture for years and we take quality and reputation as our life.

Q: How long is your delivery time?

A: Generally it is 10-20 days if the goods are in stock. or it is 20-30 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?A:Sorry, free sample is not available.

Q: What is your terms of payment ?A: Usually we accept T/T 30% in advance, then pay the 70% T/T before shipping.

Q:How to order?

A:Please send us your inquiry with detail item description or with Model number.

If there is no packing demand we take it as our regular exported standard packing.

We will offer you an order form for filling. We will recommend you the most suitable model according to information you offered.

After you send your detail requirement, we provide quotation to you.

Q:Can I expect a quality products?

A:All the production and processing are strictly according to international standard. At the same time, mature production technology ensuring the quality satisfy international request. We also welcome the third party inspection

 

GK 200 Drilling Rig Working Attentions

 

It needs to be shut down for a short time for simple maintenance after finishing the hole or before opening the hole. The first thing is to inject grease into several parts with high frequency of heavy load, such as the main winch bearing, lifting gear, main pulley, slewing support, mast luffing cylinder bearing, etc. the oil-water separator needs to be cleaned every day, and the bottom of the diesel tank needs to be cleaned every three days to check the wear of the drill bucket, If the wear is serious, repair welding can be done. Check the welding parts of drill pipe pin and drill pipe square head, check the connecting pin shaft and bolt of drill bucket hook and top cylinder, check the lock wire of bucket bottom rotary shaft, and lightly apply grease on mast slide and main coil steel wire rope

 

 

 

 

 

 

 

 

Hot Products

260m Hydraulic Crawler Type Borehole Water Well Drilling Machine Rig Mine Drilling Rig ST 260 Meters ...
300 Crawler Pneumatic Drilling Machine Impact Large Diameter Deep Water Well Drilling Rig ST 300 ...
ST 450 High Speed Water Well Drilling Equipment ,OEM Crawler Mounted Drilling Rig Machine ST 450 ...
Deep Underground St 300 Water Well Drilling Rig Machine Pneumatic Rocky Blasting Drilling Rig ...
Water Well Borehole Machine Agricultural Irrigation ST 260 Drilling Rig ST 260 Borehole Drilling ...
400 Meters Deep Underground Hole Blasting Water Well Drilling Rig Machine For Business ST 400 Water ...