Home Companies Jinzhou City Shitan Machinery Equipment CO. LTD.

OEM 400m 2.5km/H Crawler Mounted Drill Rig

Jinzhou City Shitan Machinery Equipment  CO. LTD.

Contact Us

[China] country

Trade Verify

Address: Xiaoshang Village,Jinzhou City,Hebei province,China

Contact name:Anna

Inquir Now

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

OEM 400m 2.5km/H Crawler Mounted Drill Rig

Country/Region china
City & Province jinzhou hebei
InquireNow

Product Details

 Hot selling OEM customized high speed water well drilling rig/ ST 350 Crawler Mounted Drill Rig

 

OEM customized drilling machines ST 350 Crawler Mounted Drill Rig  Application

OEM customized drilling machines ST 350 Crawler Mounted Drill Rig is suitable for  water well drilling,  exploration, geophysical road and building exploration and blasting hole drilling engineering, etc. It can be selected acording to the underlying different alloy, diamond,compact drill for drilling,etc.

 

OEM customized drilling machines ST 350 Crawler Mounted Drill Rig

Drilling depth400m
Drilling diameterΦ140-Φ350mm
Working air pressure1.7-3.5MPa
Air consumption17-30m3/min
Drilling pipe diameterΦ89, Φ102mm, Φ108mm
Length of drill pipe1.5m, 2.0m, 3.0m,6.0m
One push length6.6m
Tramming speed2.5km/h
Climbing ability (Max.)30°
Ground clearance (Min.)250mm
Rotation speed45-115 rpm
Rotation torque6500-9000 N.m
Power92 Kw
Weight10
Dimension5900x2100x2850mm

 

 

Attentions in Drilling Process Of  ST 350 Crawler Mounted Drill Rig

 

1. After drilling structure of crawler drill bit, the center drilling tool needs to be replaced in time. Firstly, the hole bottom needs to be cleaned, and then the residue at the bottom of the hole is blown clean. After the bit stops rotating, the drilling tool in the drilling rig is slowly lifted up. When the lifting force is good enough to lift the drilling tool, it is appropriate.

2. When the drill bit of crawler drilling rig is summarized in the drilling process, it is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and timely keep the hole clean when necessary, and the drill bit in the drilling rig is not allowed to pull out forcefully during the drilling process.

3. Sometimes more residual rock slag will be left at the bottom of the hole of crawler drilling rig, and the rotary part of the eccentric bit will be blocked by the rock slag, which will affect its closing production. At this time, it is necessary to transport compressed air, clean the hole again, and make the DTH hammer work for a short time, and then lift the central drilling tool again.

 

After-sales service

 

1. New machine provides technical train.
2. Once anything goes wrong with the machine by normal using,our technical person will be with you ASAP
3. When the machine should be maintained,you will receive the reminding from us.
4. According to different geological conditions,we will recommend different construction plans for you.
5. Remind you which are wearing parts,so you can get a good preparation.
6. 7*24 hours online service(wechat,whatsapp,email,phone)
7. Other customer's reasonable requirement

 

 

 

 

Hot Products

Fast Rock Drilling Machine Pneumatic Percussive Water Well Drilling Rig Machine Introduction of ...
Product Description: The Water Well Drilling Rig Machine is built to last, with a weight of 600kg ...
*, *::before, *::after {box-sizing: border-box;}* {margin: 0;}html, body {height: 100%;}body {line...
Product Description: Our Water Well Drilling Rig Machine is available in different colors to match ...
Product Description: Weighing in at 600kg, this drilling equipment rig is lightweight and can easily ...
Product Description: The Water Well Drilling Rig Machine is equipped with a powerful mud pump that ...