Home Companies Jinzhou City Shitan Machinery Equipment CO. LTD.

Irrigation 150 Meters Depth Borehole Drilling Machine XY-1A With BW 160 Mud Pump

Jinzhou City Shitan Machinery Equipment  CO. LTD.

Contact Us

[China] country

Trade Verify

Address: Xiaoshang Village,Jinzhou City,Hebei province,China

Contact name:Anna

Inquir Now

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Irrigation 150 Meters Depth Borehole Drilling Machine XY-1A With BW 160 Mud Pump

Country/Region china
City & Province jinzhou hebei
InquireNow

Product Details

Irrigation 150 Meters Depth Borehole Drilling Machine XY-1A With BW 160 Mud Pump

 

 

XY-1A Borehole Drilling Machine Description

 

Xy-1a drilling rig is a kind of hydraulic feeding, high speed, high speed torque belt and portability with pump.which is suitable for engineering geological exploration of industrial and civil buildings, railways, hydropower, transportation, bridges, dam foundations and other buildings.

 

XY-1A Borehole Drilling Machine Tech Data

 

DrillSwivel Head

Drilling depth

 

Max.150m

Spindle speed

 

1010,790,470,295,140(r/min)

Hole diameter

 

Max.150mSpindle stroke450kmm
Drill rod diameter42mmSpindle pull-downMax.15KN
Angle range90-75Spindle lifting capacityMax. 25KN
Oil pumpWater pump
ModelYBC-12/125ModelHorizontal reciprocating single-acting piston pump
Rated pressure12.5MpaWorking pressureMax. 1.25Mpa
Flow speed8ml/r  
Rated speed1500r/min  
HoistPower(diesel)
Max. lifting capacity15KNModel(diesel engineZS1105
Hoisting drum revolution

121,76,36(r/min)

 

Rated power12.1KW
Drum diameter140mmRated speed2200r/m
WEIGHTAROUND 600KG
SIZE1620*970*1560mm

 

XY-1A Borehole Drilling Machine Main Advantages

 

1. It has a hydraulic automatic feeding mechanism to improve drilling efficiency and reduce labor intensity.
2. It adopts the ball card clamping mechanism instead of the chuck, and can implement the non-stop bar, easy to operate, safe and reliable.
3.The hoist is equipped with a frame to form a double-sided support star structure that can withstand strong impact.
4.Four sets of bearing positioning of the vertical axle box ensure that the gyrator has sufficient rigidity to deal with complex geological conditions such as gravel layer and pebble layer.
5.This machine adopts a taper clutch, which has the characteristics of large transmission torque, convenient operation and maintenance-free.

 

XY-1A Borehole Drilling Machine Application 

 

XY-1A drilling rig is mainly used for geological general investigation and exploration, road and tall buliding foundation exploration, kinds of hole in concrete structure, river levees,earth temperature central air-conditioner,etc.XY-1 Series are spindle core geotechnical drilling rigs most perfectly suitable for borehole drilling in geo-construction and geo-technical exploration drilling in projects like civil building, construction of railway, hydropower, highway, bridge and dam etc. 

 

What aspects should we pay attention to in the drilling process of water well drilling rig?

 

Bit plays a very important role in the drilling of water well drilling rig, but the quality of a bit directly affects the efficiency and quality of water well drilling. Therefore, in the selection process, we should pay attention to the selection and use of lower bit. When we are operating the drill bit, we must pay attention to several aspects in order to better production and operation.

1. After the drilling structure of the drill bit of the water well drilling rig is drilled, the central drilling tool needs to be replaced in time. First, the hole bottom needs to be cleaned, and then the residue at the hole bottom needs to be blown away. After the drill bit stops rotating, the drilling tool in the water well drilling rig can be lifted up slowly. When the lifting force is just enough to lift the drilling tool, it is the most appropriate.

2. During the drilling process, the drill bit of the water well drilling rig shall be summarized. It is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and keep the hole clean when necessary. Moreover, the drill bit in the water well drilling rig shall not be pulled out by force during the drilling process.

3. Sometimes there will be more residual rock slag at the bottom of the hole of the water well drilling rig, and the rotating part of the eccentric bit will be stuck by the rock slag, which will affect its retraction and production. At this time, it is necessary to transport air pressure, clean the hole again, make the DTH hammer work in a short time, and then lift the central drilling tool again.

 

 

Hot Products

Deep Depth Crawler Wheel Trailer Mud Pump And Air Compressor DTH Ground Water Well Drilling Rig ...
Multipurpose Water Well Drilling Rigs Water Borewell Machine Price In India pneumatic crawler water ...
XY-1A Small Water Well Drilling Rig Hole Core Drilling Exploration Geological Machine Water Well ...
Deep Depth Crawler Wheel Trailer Mud Pump And Air Compressor DTH Ground Water Well Drilling Rig ...
Multipurpose Water Well Drilling Rigs Water Borewell Machine Price In India pneumatic crawler water ...
150m Rotary Diamond Exploration Water Well Borehole Core Drilling Rig Machine Drilling Machine brief ...