Home Companies Beijing Sinovo International & Sinovo Heavy Industry Co.Ltd.

Fully Hydraulic Pile Breaker SPF450B For Pile Diameter 350 - 450mm to break square concrete pile

Beijing Sinovo International & Sinovo Heavy Industry Co.Ltd.

Contact Us

Trade Verify

Address: Suite 2308, Huatengbeitang Building, No.37 Nanmofang Road, Chaoyang District, Beijing City. China

Contact name:Alan Wang

Inquir Now

Beijing Sinovo International & Sinovo Heavy Industry Co.Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Fully Hydraulic Pile Breaker SPF450B For Pile Diameter 350 - 450mm to break square concrete pile

City & Province beijing beijing
Categories Battery Chargers
InquireNow

Product Details

 

Fully Hydraulic Breaker SPF450B For Pile Diameter 350-450mm

 

The leading hydraulic pile breaker with five patented technologies and adjustable chain, it is the most efficient equipment to break the foundation plies. Due to the modular design the pile breaker can be used for breaking different sizes of piles. Equipped with the chains. it can work with different equipment to break piles.

 

 


The SPF450B hydraulic pile breaker has the following features: easy operation, high efficiency, low cost, less noise, more safty and steadibility. It imposes no impact force on the parent body of the pile and no influence on the bearing capacity of the pile, and shortens the construction period greatly. It is applicable for pile-group works and is recommended strongly by the construction department and the supervisiondepartment.

 

 

Operation steps (Apply to all Pile Breakers)
1. According to pile diameter, with reference to the construction reference parameters corresponding to the number of modules, directly connect the breakers to the work platform with a quick coupler;
2. The working platform can be excavator, lifting device and hydraulic pump station combination, the lifting device can be truck crane, crawler cranes, etc;
3. Move the pile breaker to the working pile head section;
4. Adjust the pile breaker to the suitable height (please refer to construction parameter list when crushing the pile,otherwise the chain may be broken), and clamp the pile position to be cut;
5. Adjust the excavator's system pressure according to the concrete strength, and pressurize the cylinder until the concrete pile breaks under high pressure;
6. After the pile is crushed, hoist the concrete block;
7. Move the crushed pile to the designated position.

 

 

 

 

Specification

ModelSPF450B
Range of pile diameter(mm)350-450mm
Maximum Drill rod pressure790kN
Maximum stroke of hydraulic cylinder205mm
Maximum pressure of hydraulic cylinder31.5MPa
Maximum flow of single cylinder25L/min
Cut the number of pile/8h120
Height for cutting pile each time

≦300 mm

Supporting the digging machine Tonnage(excavator)

≧20 t

 

Packing photo:

 

Shipping photo:

 

Hot Products

Brand new XYT-2B Core Drilling Rig Mounted On Trailer With Self-erect Hydraulic Derrick, Equip 24.6 ...
XYT-200 Mechanical Spindle Trailer Type Core Drilling Equipment High Rotating Exploration TRAILER ...
XY-2B Core Drilling Rig XY-2B drilling rig is type of vertical shaft drill, which can be powered by ...
Product details: SD1000 crawler type full hydraulic core drilling rig is a kind of full hydraulic ...
YDL-2B Core Drilling Rig Rock Core Drilling Machine 600m Max Drilling Length YDL-2B full hydraulic ...
SD2000 Full Hydraulic Core Drilling Rig SD-2000 full hydraulic crawler driving core drilling rig is ...