Home Companies Bestaro Machinery Co.,Ltd

Double Cantilever 5 - 40m 20t Double Beam Gantry Crane U Type

Bestaro Machinery Co.,Ltd

Contact Us

[China] country

Trade Verify

Address: No.1,Wei'er Road, Changyuan Crane Industrial Park, Xinxiang City, Henan Province.China

Contact name:Tina Tan

Inquir Now

Bestaro Machinery Co.,Ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Double Cantilever 5 - 40m 20t Double Beam Gantry Crane U Type

Country/Region china
City & Province xinxiang henan
InquireNow

Product Details

Double Cantilever 5 - 40m 20t Double Beam Gantry Crane U Type

 

Double girder gantry crane structure:

 

The electric double-girder gantry crane is composed of cart running mechanism, lower beam, outriggers, driver's cab, main beam, trolley running mechanism, hoisting mechanism, escalator, electrical appliances and other components:


1. Cart running mechanism
It is mainly composed of a lower beam and a trolley, of which the trolley is composed of a driving wheel group and a driven wheel group. The running mechanism includes a motor, a reducer, a gear, and a wheel group.
2. Outriggers
The section steel is used as the material, and then welded into a cage-shaped mechanism, the lower end is connected with the lower beam, and the upper end is connected with the main beam bolts through flanges.
3. Cab
The skeleton is made of profiled steel, the outer shell is welded on the skeleton with thin steel plates, the driver's cab is closed with broken lines, and the electrical appliances, power distribution cabinets and lines of the operating mechanism are generally located in the driver's cab.
4. Main beam
The section steel and the steel plate are welded, generally welded into a truss triangle. On the main beam, there are also trolley running rails.
5. Trolley running mechanism
The main components are similar to the running mechanism of the cart. The motor is driven by the reducer, and the pinion on the reducer is then transmitted to the large gear, so that the cart can travel back and forth.
6. Lifting mechanism
It is installed on the trolley frame, and the lifting movement is realized through the hoist and the matching fixed pulley, movable pulley or hook.

 

Technical Parameter:

 

Lifting Weight101620/1032/1036/1650/10
Span(m)18/22/26/30/3518/223018/22/26/30/3522/2622/26/30/3532
Lifting HeightPrimary11.510.51210.511.511.512
Secondary  11121213
Working Duty A5A5~A6A5A5~A6A5~A6
SpeedLiftPrimary(m/min)18.412.39.210.410.46
Secondary  13.213.212.318
TravelHandcart43.844.544.541.95138.13
Cart54.648.451.249.151.24851.251.251.243.8
Steel Track (Kg/m)4350

 

Double girder gantry crane notice:

 

The workplace of the gantry crane is usually in the open air environment such as seaside wharf, next to the railway or other large factories of heavy industry, and the temperature in the open environment changes drastically. During the working process, factors such as vibration and shock are unfavorable to it. More seriously, when the capacity of the power supply transformer becomes smaller and the cross-section of the power supply cable is reduced, it often causes instantaneous voltage shortage.​​

 

Selection of gantry crane:

 

1. Double girder gantry crane Lifting capacity.

2. Span length.(rail center to rail center)

3. Lifting height.(hook center to ground)
 
Double girder gantry crane Photo:

 


 

Hot Products

Frequency Control And Braking European Standard Single Girder Overhead Cranes Easy To Use Introducti...
High transmission Efficiency Single Girder overhead Crane 15 ton span 1-15m high safety and saving ...
Workshop1-10ton single girder EOT overhead crane European standard OEM electric travelling crane ...
Heavy Duty Construction Lift A3-A8 1-20t Capacity *, *::before, *::after {box-sizing: border-box; } ...
High Speed 20-30m/min Construction Lift Crane with Cabin/Remote Control & Customized Color *, *:...
Single Girder Overhead Crane 380V/50Hz/3Ph Traveling Speed 20-30m/min for Heavy Duty Material ...