Home Companies Bestaro Machinery Co.,Ltd

Large Capacity Double Girder 10 Ton Overhead Crane Logistics Turnover DG EOT Crane

Bestaro Machinery Co.,Ltd

Contact Us

[China] country

Trade Verify

Address: No.1,Wei'er Road, Changyuan Crane Industrial Park, Xinxiang City, Henan Province.China

Contact name:Tina Tan

Inquir Now

Bestaro Machinery Co.,Ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Large Capacity Double Girder 10 Ton Overhead Crane Logistics Turnover DG EOT Crane

Country/Region china
City & Province xinxiang henan
InquireNow

Product Details

Firm And Reliable Double Girder Overhead Crane With Large Lifting Capacity

 

Introduction:

 

The double-girder overhead crane is composed of straight rail, crane main beam, lifting trolley, power transmission system and electrical control system, and is especially suitable for material conveying in the plane range with large suspension and large lifting capacity.

 

The double-girder bridge crane has strong bearing capacity, large span, good overall stability and many varieties, but its own quality is larger than that of the single-girder gantry crane with the same lifting capacity, and the cost is also higher.

 

Technical Parameter:

 

Cap (t)5/ 10
Span (m)10.513.516.519.522.525.528.531.5

Main

Dimensions

(mm)

H1763/1800
H1765
H224126226376526676826976
H323962546264627962946309632463396
H471-552
K1400-2000
W340035505000
B505452045948
b230
Max. Wheel Load (KN)72-152
Total Power (KW)10-15.5
Lifting Height (m)16
Hoisting Speed (m/min)5

 

The difference between single girder and double girder overhead crane:

 

1. The two are structurally different
Generally, single-girder bridge cranes are relatively simple in structure, light in weight, and relatively simple in installation, daily maintenance, and assembly and disassembly. However, the double-girder bridge crane is relatively complex in structure and has a large weight, and is relatively complicated in installation and daily maintenance and repair.

 

2. Different production costs
Single girder overhead cranes are shorter in span and consume less construction materials, so they cost less. The double-girder bridge crane has a larger span, more consumables, and higher technical content, so the production cost is higher.

 

3. Differences in the way of operation
In terms of operation mode, single-girder cranes are generally operated on the ground, which can be operated by handle and remote control, while double-girder bridge cranes require workers to control them during operation.

 

4. Mechanical properties
In terms of mechanical performance, the stability of single-girder overhead cranes is relatively low, the rated lifting capacity is relatively small, and the work level is relatively low. The double-girder overhead crane has relatively high stability, heavier rated lifting capacity, and relatively high working level.

 

5. The working environment of the two is different
Generally, single-girder bridge cranes are suitable for workplaces with short spans, relatively light lifting weights and relatively small construction site space. The double-girder bridge crane is suitable for sites with long spans, relatively heavy lifting capacity and wide construction site space.

 

Application:

 

Double girder overhead crane is an important tool and equipment to realize mechanization and automation of production process in modern industrial production and lifting and transportation. Therefore, double-girder bridge cranes are widely used in indoor and outdoor industrial and mining enterprises, iron and steel chemical industry, railway transportation, port terminals and logistics turnover and other departments and places.

 

Photos:

 

Hot Products

Frequency Control And Braking European Standard Single Girder Overhead Cranes Easy To Use Introducti...
High transmission Efficiency Single Girder overhead Crane 15 ton span 1-15m high safety and saving ...
Workshop1-10ton single girder EOT overhead crane European standard OEM electric travelling crane ...
Heavy Duty Construction Lift A3-A8 1-20t Capacity *, *::before, *::after {box-sizing: border-box; } ...
High Speed 20-30m/min Construction Lift Crane with Cabin/Remote Control & Customized Color *, *:...
Single Girder Overhead Crane 380V/50Hz/3Ph Traveling Speed 20-30m/min for Heavy Duty Material ...