Home Companies Xiamen Comwinning Imp.&Exp.Co.,Ltd

VFD Drive Mode Rack And Pinion Hoist / Man And Material Lift With LED Ceiling Lamp

Xiamen Comwinning Imp.&Exp.Co.,Ltd

Contact Us

[China] country

Trade Verify

Address: Rm. 704, No. 30, Binglang Dongli, Siming District, Xiamen, China

Contact name:Chen Junjie

Inquir Now

Xiamen Comwinning Imp.&Exp.Co.,Ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

VFD Drive Mode Rack And Pinion Hoist / Man And Material Lift With LED Ceiling Lamp

Country/Region china
City & Province xiamen fujian
Categories Inverters & Converters
InquireNow

Product Details

Rack and pinion hoist man and material lift SC300BG MP-B15 SC300/300BG MP-B16

 

Production and Materials


KANGBO implements the true modular design of rack and pinion hoists, standardization and fine finishing of lifts parts and spare parts, and assembly line production. The material elevator components are versatile and universal.
Main structure frame are made of 16Mn and Q345 high strength cold roll steel plate, cut by laser, process by CNC machines in tool fixtures, welded by robots.
The construction lift cage roof is made by a full steel plate, and the edges are totally welded, to ensure no water leakage and high strength.

 

Configuration
There is a electrical small crane available to facilitate the assembly of the construction elevator.
There is the additional 'C' door at cage side for convenient loading/unloading.
Available in single or twin hoist cage configuration.
The construction rack and pinion elevators are Variable Frequency Drive (VFD), with low starting current and much less wear and tear, very smooth starting and stopping.
Manual or Automatic Controls of the hoist is optional.
Lighting inside construction elevator car is LED ceiling lamp
The construction material hoist cage roof doors are equipped with Interlock.
Equipped with hoist drop test facility with remote control.
A frequency control unit (FC), with closed-loop, be equipped.

 

Technical Data

Item & Article No.SC300BG, MP-B15; SC300/300BG, MP-B16
Payload Capacity3,000 KG per Cage
Lifting Speed0–60 m/min.
Max. Lifting Height250/400 m*
Cage Width (Internal)1.5 m
Cage Length (Internal)3.2 m
Cage Height (Internal)2.35 m
Cage Doors3 Doors, Entry Door + Exit Door + Side Door
Motor ControlFC (Frequency Control)
Engine Power3x23 KW per Cage
GearboxHelical Gearbox
Safety Device TypeCentrifugal Brake
Power Supply Range380–500 V, 50 or 60 Hz, 3 Phase
Mast SectionSquare Column 650*650*1508 mm with Bolted Rack
Rack module8
* Increased lifting height on request. 250 m with step-up transformer only. 400 m with step-up/step-down transformer.

 

Hot Products

Construction site hoist rack and pinion high speed heavy payload SC250BG KP-B19 Production and ...
Construction site hoist rack pinion high speed heavy payload SC250/250(BG) KP-B20 Features and ...
Construction site hoist rack pinion type twin cage VFD SC100/100(BZ) KP-B02 Features and Advantages ...
Construction Site Hoist Rack Pinion Type VFD Single Cage SC100(BZ) KP-B01 Features and Advantages * ...
Construction Site Hoist Rack Pinion Type VFD Single Cage SC100(BZ) KP-B01 Features and Advantages * ...
Construction site hoist rack and pinion high speed heavy payload SC250BG KP-B19 Production and ...