Home Companies Xiamen Comwinning Imp.&Exp.Co.,Ltd

Man Material Lift Construction Hoist Parts Change Over Switch With Copper / Plastic Material

Xiamen Comwinning Imp.&Exp.Co.,Ltd

Contact Us

[China] country

Trade Verify

Address: Rm. 704, No. 30, Binglang Dongli, Siming District, Xiamen, China

Contact name:Chen Junjie

Inquir Now

Xiamen Comwinning Imp.&Exp.Co.,Ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Man Material Lift Construction Hoist Parts Change Over Switch With Copper / Plastic Material

Country/Region china
City & Province xiamen fujian
Categories Other Switches
InquireNow

Product Details

Rack and pinion Construction Man Material Lift Change-over Switch

There are two operation mode in the rack and pinon hoists, one is normal daily operation, the other is special mode for maintenance or assembling or dismantling.  

During the maintenance or assembling or dismantling of the construction elevators, for safety purpose, the operation need to be control by the maintenance or assembling or dismantling personnels. 

Rack and pinion Construction Man Material Lift Change-over Switch is the electrical component to switch the Console operation to Cage Top Portable Operate Box OperationTo switch the Console operation to Cage Top Portable Operate Box Operation.

Hot Products

Construction site hoist rack and pinion high speed heavy payload SC250BG KP-B19 Production and ...
Construction site hoist rack pinion high speed heavy payload SC250/250(BG) KP-B20 Features and ...
Construction site hoist rack pinion type twin cage VFD SC100/100(BZ) KP-B02 Features and Advantages ...
Construction Site Hoist Rack Pinion Type VFD Single Cage SC100(BZ) KP-B01 Features and Advantages * ...
Construction Site Hoist Rack Pinion Type VFD Single Cage SC100(BZ) KP-B01 Features and Advantages * ...
Construction site hoist rack and pinion high speed heavy payload SC250BG KP-B19 Production and ...