Home Companies ChangSha Zoomwolf Machinery CO.,LTD

380V/50HZ Concrete Placing Boom Floor Or Shaft Climbing

ChangSha Zoomwolf Machinery CO.,LTD
Active Member

Contact Us

[China] country

Address: Yinpen South Road,Yuelu District,Changsha City,Hunan Province,China

Contact name:Ms.fu

Inquir Now

ChangSha Zoomwolf Machinery CO.,LTD

380V/50HZ Concrete Placing Boom Floor Or Shaft Climbing

Country/Region china
City & Province changsha hunan
Categories Pumps
InquireNow

Product Details

380V/50HZ  Concrete Placing Boom Floor Or Shaft Climbing

 

Features
Optimal design of boom-&column-structure ,Inner hydraulic oil tank renders a compact placement.

The key components of hydraulic- and electrical-system are from world famous brand,which ensure safety and stability.

 

For option:
1. Standard types without counter weight
2. Floor or shaft climbing
3. Step speed or stepless speed(proportional control)
4. Column length:5m,8m,10m
5. Delivery pipes for option as project budget:
⑴ Ordinary single straight pipe and cast steel bend,service life not more than 20,000m3 ;
⑵ High wear resistance double straight pipe and bend,service life not less than 50,000m3;

 

 

Technical Specifications
Model of placing boomHGY29S-3RHGY29P-3RHGY29SC-3RHGY29PC-3R
PerformanceMax. radius (m)29
Free standing height,22.7m,400°
Slewing range
Working temperature(℃)0~60℃
Counter weight(kg)/2930
Total weight(kg)1910022030
Supply power to equipment380V/50Hz
Electric motorMotor modelY2-160L-4
Power(kW)15
Hydraulic systemSystem pressure(MPa)32
Flow(L/min)18
Oil tank capacity(L)280
Control mode(Cable+Radio) remote control
Clearing mode for concrete pipeWater clear / Dry clear
Section of tubular column (m×m)0.75×0.75
Arm(Booms)Boom modelfully hydraulic foldable arms
Delivery pipeline diameterDN125mm
Length of end hose (〃×m)5〃×3
The first sectionLength(m)10.9
 Articulation-2.5°~82.5°
The second sectionLength(m)9.6
 Articulation0°~180°
The third sectionLength(m)8.5
 Articulation0°~180°
ClimbingClimbing modeCylinder jack lifting
Internal climbing step distance(m)0.52
Floor FrameHole prepared in floor
Shaft FrameSize of climbing shaft : 2.0m-2.7m
Min. space between internal climbing frameClimbing(m)3
 Placing concrete(m)6
 Rest(m)6

 

Maintenance of concrete placing boom

 

Remote control and electric control system: waterproof, anti-magnetic, anti - impact.

 

Lubrication point: add lubricating oil regularly.

 

Hydraulic oil and hydraulic system: anti-pollution, anti-emulsification, often pay attention to the tank level gauge.Once the hydraulic oil is contaminated or emulsified, the placing boom must be stopped immediately and all the hydraulic oil replaced. If the liquid level gauge shows insufficient oil, be sure to fill up.

 

Conveying pipe: conveying pipe inner wall with concrete direct contact and relative movement, will cause wall wear.When the wall thickness gradually reduced to a certain extent, will not withstand the pressure of the concrete inside the pipe leading to burst, and even cause safety accidents!Therefore, when the placing boom has been used for a long time and the concrete content of the conveying pipe reaches 50% of the conveying pipe life, it is necessary to check the thickness of the pipe wall as a daily work.

 

Daily cleaning of spatter concrete: due to the frequent spatter of concrete falling from the upper floors, damage to the internal climbing devices (especially the jacking cylinder) must be cleaned frequently, so that the concrete cannot accumulate and condense. Therefore, it is suggested that under the premise of not affecting the normal work, try to cover the internal climbing device to prevent it from being polluted by concrete.

 

About the model

HGY ×× S or P C or blank - × R

  ①   ②     ③        ④              ⑤

 

① Hydraulic concrete distributor

② Round number of Max.radius(m)

③ Step speed regulation(S)or

Proportional control speed regulation(P)

④ With(C)or without(blank) counter weight

⑤ Arm section number ×Roll folding(R)

 

Identification letter description

S: Step-speed adjustment

P: Proportional (Stepless speed regulation)

C: Counter weight

 

The sample

1. Model HGY33S-3R means:

Without counter weight,max.radius 33m,step speed regulation and 3 roll-folding arms.

2. Model HGY33PC-4R means:

With counter weight,max.radius 33m, proportional control speed regulation and 4 roll-folding arms.

 

 

Hot Products

Technical Specifications Model of placing boom HGY29S-3R HGY29P-3R HGY29SC-3R HGY29PC-3R Performance ...
Professional Placing Boom Concrete Pump Remote Control ISO9001 Certification Features Optimal design ...
380V/50HZ Concrete Placing Boom Floor Or Shaft Climbing Features Optimal design of boom-&column...
Construction Buildings Boom Pressure Concrete Pump Inner Hydraulic Oil Tank Features Optimal design ...
Static Concrete Placing Boom / High Wear Resistance Boom tube and bend For option: 1. Standard types ...
Hydraulic Placing Boom 22.7m Free Standing Height Features Optimal design of boom-&column-structure ...