daoyi polymer co ltd |
|
Product Description
Excellent physical and chemical properties of our granules create comfortable conditions for professional sporting. Flexible material with specified parameters makes the running tracks and football fields springy and supports dynamic and smooth movements.Top layers dedicated to different sport disciplines have suitable anti-slippery properties. In particular, the granules are usedto build professional athletic race tracks in stadiums and to fill artificial turf for football grounds as well as for tennis court surface.
Technical data sheet
Descripion | Artificial Grass Rubber Granules |
Color | green and other colors |
Items | Unit | Test Results |
Tensile Strength | MPA | 4-20 |
Density | g/cm³ | 1.05-1.15 |
Hardness Shore A | ShoreA | 60A±2A |
Tensile Elongation @Brk | % | 300-780 |
Tear strength | KN/m | 20-68 |
Artificial grass installation
1. Prepare and test the base ground:Inspect the foundation to
ensure it has a flat and smooth surface and appropriate slopes,
making sure the foundation is qualified for installing artificial
grass.
2. Measuring line:Locate the centers of the ground and the two
semicircles, and according to these three centers locate the
intersecting point of half-way lines and touchlines, and then
determine the positions of functional lines and spot by using
Pythagorean proposition.
3. Palletising turf roll:According to drawing, position the turf
rolls on the exact places along the touchline.
4. Cutting the edge:Cut white turf piece into strips(width to be as
per actual need) for white functional lines(half-way lines, base
lines etc.), and put them aside preparing for installation.
5. Cutting white line:Measure and re-position the white line on the
turf that has been all well joined on the ground. Cut the turf out
and place the seam tape beneath the cuts.
6. Infill rubber granules:After sand infilling, Place the rubber
granules piles on the lawn on different spots evenly at a distance
of 4m from each other, then spread them evenly on the lawn(the
quantity of sand depends on the pile height of the turf).
Afterwards, use the combing machine to sweep the sand into the
fibers and to comb up the fibers. Do this process once
longitudinally and transversely.
7. Brushing: to brush the grass in the vertical and horizontal one
time by the grass-brushing machine
8. Check and Acceptance:Inspect the entire finished lawn as per
concerned standards and requirement. If any defects found, correct
it.
Quick question
Q:What is your capability per year? I have a big order!
A:Our capability is 25.000 tons per year, please don’t worry!
Q:How would you promote your company or products in the overseas?
A:I prefer to corporate with local agent. There are so many local projects and very different cultures. For me, I would like to have a local company to do local business. If you are looking for a long-term cooperation, looking for a great supplier, I am your best choice!
Product picture