Home Companies Daoyunai Energy Saving Technology Limited

CIPP UV Curing Process Installation Program Underground Space Management Materials

Daoyunai Energy Saving Technology Limited

Contact Us

[China] country

Trade Verify

Address: Building 5, No. 1288, Kungang Highway, Songjiang district, Shanghai city

Contact name:Aaron Wang

Inquir Now

Daoyunai Energy Saving Technology Limited

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

CIPP UV Curing Process Installation Program Underground Space Management Materials

Country/Region china
City & Province shanghai shanghai
Categories Other Chargers
InquireNow

Product Details

Materials for CIPP installation program in underground space management

 

Necessary tools for UV CIPP cure trenchless operation

 

1. One winch with a capacity of more than 3 tons, including a steel wire rope of more than 150m (depending on the length of the repaired pipe). It is best to adjust the speed, and the slower the speed cannot be adjusted, the better.

2. Light curing hose material, bottom film, binding cloth, and lamp film.

3. Ten 1.5-inch and two-inch ties respectively. Buy better and stronger tensioners.

4. Two small water pumps are used to pump water in the well chamber, or two Self-priming pumps.

5. Four interphones, two batteries for field communication.

6. Non-woven fabric or thick carpet 3m*10m, laid on the ground to protect materials.

7. Square timber 50-80cm, ready to be dried.

8. Several vises are used to fine-tune and fix materials at the bottom of the well.

9. Two lifting lugs are used for pulling materials.

10. One 750W axial flow fan is used for forced ventilation of the well chamber.

11. The 4-angle grinder with several cutting blades. It is recommended to use compressed air power.

12. Two traction ropes of 8mm and more than 100m are used to drag the bottom film and steel wire rope.

13. Portable power distribution box is used to supply power to the axial flow fan, small water pump, angle grinder and well lighting fixtures.

14. Several respirators or respirators with filters and goggles.

15. There are several cotton gloves, which are only used for changing bulbs. There are several rubber gloves.

16. One section of the 10m air duct is equipped with a D65 fire connector, and two sections are prepared.

17. 10m hose with 1-inch air compressor connector and air release valve at the other end.

18. The steel pipe is 40cm long and 65cm long, with bearings inside at both ends. It is used to walk the steel wire rope when dragging materials.

19. Several rolls of plastic film are used to protect the stainless steel tie head.

20. More than 10 industrial art knives are used for cutting hoses.

21. Two small crowbars are used to tighten stainless steel ties.

22. Six LED headlights are used for bottom lighting.

 

 Function Repair sewer
 Application CIPP UV light cure
 Length Any length is possible

 

Hot Products

D919 UV curing equipment pipeline inspection and repair equipment custom lamp bracket leg Requiremen...
Useful tools package for CIPP-UV cure construction on job-site The useful tools package is specially ...
Advanced customized headlamp wheel rack of UV curing equipment manufacturer Operation process of UV ...
CIPP mercury lamp UV cure system for underground drainage trenchless renovation D919 High Voltage ...
Integrated UV-CIPP renovation truck for municipal drainage network D919 UV light cure integrated ...
NO-Digging repair underground sewer network by high and new technology CIPP UV Important items for ...