Home Companies Daoyunai Energy Saving Technology Limited

Lining Rig UV Cured CIPP Truck Municipal Sewer Trenchless Drain Pipe Repair Integrated

Daoyunai Energy Saving Technology Limited

Contact Us

[China] country

Trade Verify

Address: Building 5, No. 1288, Kungang Highway, Songjiang district, Shanghai city

Contact name:Aaron Wang

Inquir Now

Daoyunai Energy Saving Technology Limited

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Lining Rig UV Cured CIPP Truck Municipal Sewer Trenchless Drain Pipe Repair Integrated

Country/Region china
City & Province shanghai shanghai
InquireNow

Product Details

UV cured integrated truck for municipal sewer pipeline via trenchless repair

 

Inflation and pressure during CIPP UV work

 

Before inflation, check whether the pressure detection equipment is normal. If there is any problem, deal with it in time before use.

 

The pressing shall be carried out in strict accordance with the pressing requirements. Generally, the stress area of materials with a small diameter is small and the pressure is large, while the stress area of materials with a large diameter is large and the pressure is small. During the inflation of materials, the pressure shall be observed at any time, and the pressure rise shall be controlled slowly. After reaching the target pressure, the pressure shall be maintained for a period of time (generally 30 minutes).

 

During this process, it is necessary to observe whether the binding head is loose and whether the material is close to the inner wall of the pipe. If it is not close to the inner wall, the pressure maintaining time can be appropriately extended or the inflation pressure can be appropriately increased.

 

After the material is pressed, do not immediately pull the small lamp or headlamp to the other end of the material. When the material pressure of a large pipe diameter rises to the target pressure, turn on the headlamp.

 

During the pressure maintaining process, the internal conditions of the material must be carefully observed through the internal camera. Whether the inner membrane of the lower lamp material end is damaged and whether there is air intake can be identified at this time. When installing the binding head, the gas entering the material will soon be discharged through the observation port. If the inner membrane of the material is damaged, the gas inside the material will not decrease slowly and will increase with the pressing time. If the inner membrane of materials above  DN600 is damaged, open the binding cap at this time, find the damaged part and repair it with adhesive tape.

 

Truck integrated mobile center for CIPP
Length Any
Duration 5-8 hours

 

 

 

 

Hot Products

Energy-saving and environment-friendly UV CIPP integrated equipment for repair D919 UV UV curing ...
CIPP LED lamp UV cure system for underground sewer pipeline trenchless repair D919 ultraviolet (UV) ...
Trenchless CIPP UV cure system for pipes and sewers NO-DIGGING The sewer network differs in ...
D919 UV curing equipment pipeline inspection and repair equipment custom lamp bracket leg Requiremen...
Quiet and high-efficiency generator for municipal contractors CIPP D45 generator is especially for ...
Useful tools package for CIPP-UV cure construction on job-site The useful tools package is specially ...