Home Companies Daoyunai Energy Saving Technology Limited

High Pressure Expandable Inflatable Pipe Plug For Sewage And Drain Pipes

Daoyunai Energy Saving Technology Limited

Contact Us

[China] country

Trade Verify

Address: Building 5, No. 1288, Kungang Highway, Songjiang district, Shanghai city

Contact name:Aaron Wang

Inquir Now

Daoyunai Energy Saving Technology Limited

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

High Pressure Expandable Inflatable Pipe Plug For Sewage And Drain Pipes

Country/Region china
City & Province shanghai shanghai
InquireNow

Product Details

Inflatable expandable pipe plug for temporary sealing of sewage and drain pipes

 

Our plug is made of imported rubber and high tensile fiber interwoven with strong pressure resistance, high safety factor, high wear resistance and flexibility, anti-aging and excellent sealing performance.

 

The product pressure ranges from 0.15Mpa to 0.3Mpa, which is more than ten times the pressure of ordinary airbags, and is extremely safe. The water depth used can block water depths of about 1 to 20 meters depending on the specifications.

 

Although the pipe plug has a high pressure resistant, it is recommended not to rely too much on the plug when it comes to personal safety issues during construction.

 

The plug should be used at a pressure of 0.1mpa-0.15mpa within a sealing depth of 5 meters. When the sealing water depth is within ten meters, the plug operating pressure is preferably 0.13mpa-0.2mpa.

 

Operation:

 

  • Over-pressure use is strictly prohibited!
  • It is forbidden for people to get close to the inflating or working plug and stay away from the entrance of the manhole!
  • No inflation on the ground!
  • Using a strong rope/wire rope to pull the plug to the ground!
  • Cleaning debris and sharp objects in the pipes and wells before inserting the plug!
  • Monitoring and preventing toxic gases inside pipelines!
  • It is recommended to store in shading, room temperature and ventilation space!

 

Blocking construction requirements:

 

  • Along the direction of water flow, that is, upstream blocking.
  • The plug should be inserted into the pipe to a distance of no less than one meter!
  • Prevent the plug from jumping out of the pipe when inflated!
  • When taking out the plug, it is sometimes to get stuck, so do not pull hard. Check whether there are any foreign objects, such as tree roots, etc., and then remove them after fully deflating them.
  • Check the gauge pressure always to make sure it is enough.
Application Temporary sealing of sewage and drain pipes
Pipe size From DN200-4000
Water level 5 meters and 10 meters

 

 

Hot Products

High-quality Fiberglass Chopped Strand Mat Cloth Roll Resin Compatible Introducing Our Diverse Range ...
Product Description: The UV Curing Integral System represents a cutting-edge UV-Cured In Place ...
Product Description: UV CIPP Liner - Product Overview Introducing the UV CIPP Liner, the latest ...
Product Description: UV CIPP Lining Product Overview The UV CIPP Lining is a revolutionary product ...
3000M/Day UV CIPP Liner-Reliable Supplier in the Trenchless Repair Industry Daoyunai having the ...
Product Description: CCTV Pipe Crawler CCTV Pipe Crawler is a cutting-edge sewer inspection device ...