Home Companies Zhangjiagang Jiayuan Machinery Co.,Ltd.

Energy Drink Carbonated Beverage Can Filling Production Line

Zhangjiagang Jiayuan Machinery Co.,Ltd.
Active Member

Contact Us

[China] country

Address: No. 198, Zhenbei Road, Leyu Town, Zhangjiagang City, Jiangsu Province, China

Contact name:Evan Chu

Inquir Now

Zhangjiagang Jiayuan Machinery Co.,Ltd.

Energy Drink Carbonated Beverage Can Filling Production Line

Country/Region china
City & Province jiangsu
Categories Plastic Extruders
InquireNow

Product Details

Small Factory Energy Drink / Carbonated Beverage Can Filling Production Line

 

The aluminum can production line consists of three parts: rinsing, filling, and sealing.

The small production line is easy to operate and suitable for small-scale customers.

The speed is not high, which is an ideal equipment for many small investors.

 

It can fill all carbonated soft drink, include cola, soda, energy drink, sparkling water, beer,

capacity is about 1000-2000 cans/hr.

 

can riner filler capper

 

carbonated soft drink CO2 mixer/ carbonator

Main Machine in Can csd drink filling packing production plant/ line.

1/Preparing System
2/Water Treatment Syatem
3/Empty can unloading machine
4/Slide - type empty tank spray washer
5/Can juice/csd drink filling sealing 2 in 1 monoblock
6/Spray sterilizing chiller (including local control cabinet and electrical control device)
7/Wrapping machine
 

can warmer

Final products

Parameters:
Capacity
500-2000bph
Power
0.37kw
Dimension
1050*950*1600mm
Weight
280kg
Applicable bottle
Dφ50-100mm, H50-350mm

 

Our service

1.) Sample service
We can send you a working video of the machine.
You are very welcome to visit our company and inspect the operation of the machine on site. We will send people to the airport to pick you up.


2.) Customized service
We can customize the machine according to all the customers(such as material, power, filling type, bottle size, and so on), at the same time, our engineers will also give professional advice to help customers better establish the ideal factory.


3.) After-sale service

After receiving the final payment, we will provide the bill of lading on time to ensure that the customer receives the goods as soon as possible.
When you have completed all the preparations, we will send engineers to your factory to install the machines and train your employees until they can operate the machine very well.
We can provide one year warranty with spare parts free, And free lifetime technical service.

Hot Products

Automatic 1 Tons Water Purifying Machine With Hydranautics Filter Membrane Quick Detail: 1. Main ...
Fully Automatic Water Purification Equipment RO 2.75kw for PET Bottle Quick Detail: Capacity range: ...
2 Tons Water Purifying Machine , RO Water Treatment System Quick Detail: Capacity range: 2 tons per ...
Electric 2000 L/H Water Purifying Equipment SUS304 Water Treatment Machine Quick Detail: Capacity ...
5 Tons per hour SUS304 drinking water mineral water purifier machine Quick Detail: Capacity range: 5 ...
Stainless Steel 5000 LPH Water Purifying Machine Semi Automatic For Beverage​ Quick Detail: Capacity ...