Home Companies Zhangjiagang HuaDong Boiler Co., Ltd.

SA -210 ASME Standard Front Studded Membrane Water Wall Construction In HDB Boiler

Zhangjiagang HuaDong Boiler Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China

Contact name:Sandy Chen

Inquir Now

Zhangjiagang HuaDong Boiler Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

SA -210 ASME Standard Front Studded Membrane Water Wall Construction In HDB Boiler

Country/Region china
City & Province jiangsu
Categories Refrigeration & Heat Exchange Parts
InquireNow

Product Details

SA -210 ASME Standard Front Studded Membrane Water Wall Construction In HDB Boiler
 
Introduction of Boiler Membrane Wall
 
Water Walls has bare tube Water Walls and membrane water walls.

1Membrane water wall is made of flat steel and pipe tiles welded into the airtight tube composed of water wall.
2The bare tube water wall is composed of a row of seamless steel tubes, the structure is the most simple
3Membrane water wall is a lot of rolling good water wall fins with spot welding welded together to make a sealed combination of heating surface, both Can improve the airtightness of the furnace, reduce the air leakage, but also protect the furnace wall, reduce the weight of furnace wall, simplify the structure.

 

1Pin water wall is consisted by many pins with length 20~25mm, diameter 6~12mm welded to water wall tube.
2And then apply chrome ore refractory plastic to reduce the amount of heat absorbed by the water wall, increase the temperature of the combustion zone, applying to the case where the fuel is particularly difficult to lignite or some liquid slagging furnace. 
3According to the layout of, there are diaphragm-type and wall attached type (that is, double-sided heating) water wall. 
4The former mostly embedded in the wall of the furnace wall, single-sided endothermic; 
5The latter in most of the large boiler in the middle of the furnace, the entire furnace divided into two separate parts, double-sided heating.

 
Application of Boiler Membrane Wall
 

1Energy saving enviromental protection china supplier membrane water wall for CFB boiler are membrane walls that are made of tubes welded together with or without a strip of metal in between.
2These walls form the enclosure of the coal combustion chamber.
3Water wall tubes are also referred to as the evaporator section; they contain water mostly in liquid form which gradually evaporates as it rises in the boiler.

 
Additional information of Boiler Membrane Wall
 

1Water wall panels are used in Waste Heat recovery boilers.
2We manufacture Water wall panels,these are fabricated out of carbon steel tubes to customers' drawings and specifications.
3Special care is taken for ovality and thinning at the bent portion,during fabrication.
4We are manufacturing and supplying a comprehensive range of Waterwall Panels.
5The tubes offered by us are known to withstand a great internal pressure as a continual strip of fin material is wound spirally on the tube.
6These tubes are known to provide heat uniformly that result in an increased heat output.
7The main function of water wall panels in boiler is to absorb the heat generated by high temperature flame or flue and to generate steam or hot water in tubes, hence to reduce the temperature in the chamber.

 
Note
 

1Control of weld penetration to satisfy mechanical and heat transfer requirements Control of the deformation to acceptable tolerances. 
2 Panels routinely require straightening in the workshop after welding and heat treatment, the question to be answered is can the shop then meet the required dimensional tolerances for successful site installation?
3 Can existing shop handling procedures be used as-is without adding excessive controls that will add cost and schedule. 
4 The importance of preheating and its maintenance through the welding process could cause a number of handling and shop processing issues that will substantially increase cost. 


 

Hot Products

ASME Standard Hot Water Boiler Stack Economizer Economiser Tubes Anti Corrosion Description (1) HDB ...
Corrosion Boiler Economizer With Pipe Clamps , Carbon Steel Economizer In Boiler Product Description ...
Low temperature revamping modular heat exchange system assembly by fin tube used in boiler ...
Stainless Steel Factory Supplier Finned Tube Economizer for Steam Boiler Product Description 1 ...
H Type Tube Exhaust Gas Economizer High Efficient Heat Exchange With Headers Economizer/ Heat ...
Natural Circulation Customized Carbon Steel Boiler Economizer for Industry Introduction Economizer ...