Home Companies Zhangjiagang HuaDong Boiler Co., Ltd.

High Output Boiler Membrane Wall Tube Furnace Panel High Efficient Recovery Part

Zhangjiagang HuaDong Boiler Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China

Contact name:Sandy Chen

Inquir Now

Zhangjiagang HuaDong Boiler Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

High Output Boiler Membrane Wall Tube Furnace Panel High Efficient Recovery Part

Country/Region china
City & Province jiangsu
Categories Boiler Parts
InquireNow

Product Details

 

High Output Boiler Membrane Wall Tube Furnace Panel High Efficient Recovery Part

 

Product Description


In order to reduce the heat loss caused by air tightness and reduce the cost of heat preservation, the modern boiler USES water wall board instead of steam generating pipe.We adopt automatic finned pipe welding machine and large pipe bending machine to make water-cooled wall plate, which can have pressing head and short welding head.We provide panel integrated manhole openings in the panel.

 

 

Product Application


Boiler water walls are membrane walls that are made of tubes welded together with or without a strip of metal in between. These walls form the enclosure of the coal combustion chamber. Water wall tubes are also referred to as the evaporator section; they contain water mostly in liquid form which gradually evaporates as it rises in the boiler.

 

Product Parameter


 

NameMembrane water panel
MaterialCarbon steel,Alloy,Stainless steel
Tube sizeΦ38 - 76 mm, or as required
StandardISO , ASME
ModelStudded
ApplicationIstallable around the boiler combustion chamber

 

Product Advantages 


1. To guarantee the leakproofness of furnace wall and reduce the air leak of combustion chamber.

2. To achieve the full water cooling of combustion chamber, and the boiler accessories membrane water wall is benefit to prevent coking under the condition of supplemental firing.

3. The thermal storage capacity is small, the warming of combustion chamber is fast and the cooling is also fast, which could shorten the cooling time of boiler’s start and furnace shut down.

4. It is good to adopt top supported water cooled wall and it could reduce the load of boiler framework, which is benefit to overhang.

5. Compared with the bare tubes, the membrane water wall improves the heat absorption capacity of tubes.

6. The factory direct boiler membrane water wall could improve the Preliminary combination degree of boiler parts and reduce the installation workload.

 


Workshop

Hot Products

Low temperature revamping modular heat exchange system assembly by fin tube used in boiler ...
Stainless Steel Factory Supplier Finned Tube Economizer for Steam Boiler Product Description 1 ...
H Type Tube Exhaust Gas Economizer High Efficient Heat Exchange With Headers Economizer/ Heat ...
Natural Circulation Customized Carbon Steel Boiler Economizer for Industry Introduction Economizer ...
Double H Fin Tube Boiler Economizer System Squeezing Small Radius Boiler Spare Parts Product ...
Heat Exchange Fuel Gas Boiler Fin Tube Economizer For Power Plant Boiler Product Description Working ...