Home Companies Zhangjiagang HuaDong Boiler Co., Ltd.

Boiler Header Manifolds 660MW Coal Fired Ultra Super Critical Power Plant

Zhangjiagang HuaDong Boiler Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China

Contact name:Sandy Chen

Inquir Now

Zhangjiagang HuaDong Boiler Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Boiler Header Manifolds 660MW Coal Fired Ultra Super Critical Power Plant

Country/Region china
City & Province jiangsu
InquireNow

Product Details

Panel header 660 MW coal fired ultra super critical power plant working pressure 32.1MPa 445 deg C temperature
 
Product Description
 
1Headers form an important part of all types of boilers.
2Steam from the generating tubes is collected in headers which are therefore always under pressure.
3This pressure may vary from 300 psi to 2000 psi. Since headers are always under pressure, the utmost care is taken by us while fabricating them.
4Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the header.

 

1In manufacturing, the key of end cover hinder is welding.
2Since by manual arc welding, the weld joint is single-side welding without quality guarantee at the ends.
3In addition, due to large welding workload, frequent return for repair and long working period, it became the throat process of the whole hinder production.
4When making hinders of the style, we adopt advanced production technique, complete large equipment and mature technology, especially automatic submerged arc welding between hinders and end covers.

 

Details

 

1.The necking hinders of the Company are made by hot press and retracting of seamless steel pipes at special hinder necking machine.

2.In this way, the hinders will have thicker walls and cleaner surface. The necking cover will form membrane stress rather than bending stress with desired stress performance under the effect of inner pressure.

 

Features

 

1. Strength calculation report with applied materials information.
2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod.
3. 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler.
4. Hydraulic test report: ensure the standard working pressure and safety.

5.Excellent in welding quality, highly automatic, safe and reliable.

 

Classification

 
MaterialCarbon steel,Alloy steel,Stainless steel.
LengthAccording to costumes requirements.
Temperature Range300℃~1500℃
Diameter(OD)76mm~914mm

Hot Products

Boiler economizer exported indonesia green painted double H fin tuber carbon steel Specification: 1...
Spiral type boiler economizer super cirtical coal fired plant high temperature high pressure Spiral ...
Double H Fin Tube Carbon Steel Economizer First class product Petroleum Economizer Natural Gas ...
Double H Fin Tube Carbon Steel Economizer First class product Petroleum Economizer Natural Gas ...
Stainless steel bare tubes duplex 2205 abrasive ASTM material ASME standard heat exchanger ...
SA789-S32205 container shipment water proof wrapped higher resistance to corrosion Introduction 1. ...