Home Companies Zhangjiagang HuaDong Boiler Co., Ltd.

100 Ton Carbon Steel Boiler Spare Parts Boiler Header For Natural Gas Industry

Zhangjiagang HuaDong Boiler Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China

Contact name:Sandy Chen

Inquir Now

Zhangjiagang HuaDong Boiler Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

100 Ton Carbon Steel Boiler Spare Parts Boiler Header For Natural Gas Industry

Country/Region china
City & Province jiangsu
Categories Boiler Parts
InquireNow

Product Details

 

 

Product Description


Headers form an important part of all types of boilers. Steam from the generating tubes is collected in headers which are therefore always under pressure. This pressure may vary from 300 psi to 2000 psi. Since headers are always under pressure, the utmost care is taken by us while fabricating them. Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the header.

 

Technical parameters of customer design boiler pressure parts header for CFB boiler

 

Structureheader body, end cover, tube joint, hand cole, thermometer socket
Characteristicsadvanced welding, high automation degree, safe and reliable operation

 

 

Material


natural gas industry Boiler Header can be made of alloy steel, carbon steel or other kind of material as per the customer’s requirements. It conforms to the standard of ASTM, EN, DIN, GB.

 

The manufacturing equipment is 30~185MN hydraulic press, the forging ratio >3, the technical condition is in accordance with the standard of ASTM, EN, DIN, GB.

 

Hot-rolled steel plate produce

1.Hot-rolled plate, hot-rolled steel plate. Complete raw materials after the formation of smelting steel ingot, through the press forming process of ingot steel rolling heating.

2.Width is larger than 600mm(≥600mm), thickness is 0.35-200mm.

 

Features


1. Strength calculation report with applied materials information;
2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
3. 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler;
4. Hydraulic test report: ensure the standard working pressure and safet

 

 

HD Boiler offers a best in class facility,including


 

  • Fabrication area of 200,000 square meters
  • 150 Engineers
  • 600 Coded welders
  • 60 Licensed Inspectors (including NDT level-lll instructors)
  • Grade-ALicenses for Design and Manufacture boiler (issued by the State Administration of Quality Supervision and Inspection)
  • ISO 90001:2008 Quality System
  • ASME Certificate of Utility Boiler
  • ASME‘S’ , ‘U’ and NB stamp authorization

 

Hot Products

Stainless steel economizer exported american waste incineration plant high temperature and pressure ...
A335 P9 / SA 335 P22 ASTM Standard Power Plant Economizer 6 Inches Diameter Sprial Welding ...
Red Painted ND Or Carbon Steel Boiler Economizer HRSG Boiler ASME Standard Introduction 1. ...
Stainless steel economizer tubes CFB boiler economizer In thermal power plant high corrosion Product ...
China supply boiler spare part economizer for biomass power plant Product Description 1.Economizers ...
Boiler economizer exported indonesia green painted double H fin tuber carbon steel Specification: 1...