Home Companies Jiangyin Tongxin Vulcanizing Machine Manufacturing Co., Ltd.

Electric Heating Conveyor Belt Repair Tools Convenient Operation

Jiangyin Tongxin Vulcanizing Machine Manufacturing Co., Ltd.
Active Member

Contact Us

[China] country

Address: No. 21, Hetang Central Street, Jiangyin City, Jiangsu Province

Contact name:Cai

Inquir Now

Jiangyin Tongxin Vulcanizing Machine Manufacturing Co., Ltd.

Electric Heating Conveyor Belt Repair Tools Convenient Operation

Country/Region china
City & Province jiangsu
Categories Other Hand Tools
InquireNow

Product Details

Factory Direct Sale High Quality XBG-3 Electric Heating Tape Repairer

use:

During the operation of the tape conveyor, due to the foreign matter in the material or the failure of the machine itself, the tape will be torn along the longitudinal direction of the tape for a long distance. With this repairer, the longitudinal tear of the tape can be quickly and effectively repaired. The factory can produce special specifications of repairing equipment according to the different needs of users.

Schematic:

Electrothermal tape water cooling repairer technical parameters:

project/data/modelXBG-1XBG-2XBG-3
Repair the type of transport tapeCanvas, nylon, steel core rope transport tapeCanvas, nylon, steel core rope transport tapeCanvas, nylon, steel core rope transport tape
Repair shipping tape width(mm)650-2200650-2200650-2200
Repair tape maximum break size(mm)250×250250×600250×900
Electric heating plate dimensions(mm)
350×350320×700320×1000
Vulcanization temperature during repair145℃0-200℃Adjustable0-200℃Adjustable0-200℃Adjustable
Total power(Kw)1.913.53.5
Voltage(V)380380380
Hot plate working surface temperature difference±3±3±3
Vulcanization pressure(MPa)0.80.80.8
The heating plate rises from normal temperature to vulcanization temperature(min)<10min<10min<10min

Use the installation:

(1) Fill in the rubber in the repaired area (see the filling part in the vulcanization process of the tape joint. Or the demonstration by the service personnel of our factory when commissioning the equipment).

(2) Place the lower frame under the repaired area (all), under the rack, place the water pressure plate under the tape, and lower the heating plate (directly above the plate repairing place).

(3) Place the heating plate, the heat insulation board, and the upper frame alignment just below the repaired area.

(4) Install the tie rods, washers, nuts and tighten.

(5) Connect the electric control box and the power supply separately with one primary wire, and connect the upper heating plate with the secondary wire to correspond to the upper standard of the electric control box.

(6) Connect the water pump and the water pressure plate with a high-pressure hose, open the electric control box (see the XBG electric control box operation method for details), and fill the water pressure plate with water to the vulcanization pressure.

Hot Products

XBG-2 electric heating tape repairer use: During the operation of the belt conveyor, due to the ...
XBG-1 type electric heating tape repairer use: During the operation of the belt conveyor, due to the ...
XBG-1 Conveyor Point Repairer Conveyor Repair Point Repairer Wholesale Product alias: dot patcher ...
XBG-2 electric heating tape repairer use: During the operation of the belt conveyor, due to the ...
Factory Direct Sale High Quality XBG-3 Electric Heating Tape Repairer use: During the operation of ...
Factory Direct Sales Fork Point Repairer 1 Overview: During the operation of the belt conveyor, the ...