Home Companies Zhenjiang Great Wall Group Co.,Ltd

Specialized Production Pontoon Bailey bridge/Reusable Floating Temporary sidewalk

Zhenjiang Great Wall Group Co.,Ltd
Active Member

Contact Us

[China] country

Address: NO. 103, Nanxu Road, Zhenjiang,Jiangsu,China

Contact name:Chen

Inquir Now

Zhenjiang Great Wall Group Co.,Ltd

Specialized Production Pontoon Bailey bridge/Reusable Floating Temporary sidewalk

Country/Region china
City & Province zhenjiang jiangsu
Categories Other Rubber Products
InquireNow

Product Details

Pontoon Bailey bridge is similiar to standard bailey bridge actually;Its special feature is that the supports are made from pontoons.It has the advantages of fast-installed,easy-dismantled,parts-interchangeable,etc.
It is widely used in the military transportation,emergency earthquake and flooding relief work and road,bridge,railways construction,etc.

 

 

Name:  Bailey pontoon bridge
Alias:   assembled pontoon bridge; assembled highway steel bridge, steel bridge, steel trestle bridge; temporary pavement; temporary bridge; Bailey bridge;
Model:  321; 200; GW D;
Commonly used truss plate models: 321 type Bailey film, 200 type Bailey film, GW D type Bailey film, etc.
Maximum single span of steel bridge design: about 60 meters
Standard lane width of steel bridge: single lane 4 meters; double lane 7.35 meters; design according to demand.
Load Class: Automobile Class 10; Vehicle Class 15; Vehicle Class 20; Track Class 50; Trailer Class 80; Bicycle 40 tons;
AASHTO HS20, HS25-44, HL93, BS5400 HA + HB; City-A; City-B; Highway-I; Highway-II; Indian Standard Class-40; Australian Standard T44; Korean Standard D24, etc. Tail
Design scheme: According to the different spans and loads, choose the appropriate arrangement and floating box scheme.
Main Material of Steel Bridge: GB Q345B
Connection pin material: 30CrMnTi
Connection bolt grade: 8.8 grade high strength bolt; 10.9 grade high strength bolt.
Surface anti-corrosion: hot-dip galvanizing; paint; heavy-duty anti-corrosion paint for steel structure; asphalt paint; anti-skid aggregate treatment for bridge deck, etc.
Bridge erection methods: hoisting method; floating method, etc.
Installation time: 30-60 sunny days after abutment and other conditions are met (determined by bridge length and site conditions)
Installation requirements: 15-20 workers (determined according to site conditions)
Installation equipment: crane, hoist, jack, hand hoist, welding machine, generator, etc. (adjustable according to site conditions)
Features of steel bridge: No need to be pier, interchangeable, removable, long service life

Hot Products

Bailey bridge was introduced from UK.and It is standard bridge equipment,adopted extensively and the ...
D-bridge is the patent of Grert Wall.It was invited fom Gemany and has advantage in the long -span ...
Bailey bridge was introduced from UK.and It is standard bridge equipment,adopted extensively and the ...
Bailey bridge was introduced from UK.and It is standard bridge equipment,adopted extensively and the ...
Bailey bridge was introduced from UK.and It is standard bridge equipment,adopted extensively and the ...
Because of the advantages of fast erection and light structure of the assembled steel bridge, it can ...