ZhongHeng Machine Manufacture Co.,Ltd |
|
Metal Floor Deck Roll Forming Machine With 7 - 15m /
Min Forming Speed
1. Machine picture
2. Panel
3.Specifications
NO. | ITEM | PARAMETER | NOTE | |
1. | Suitable | Type | Galvanized sheet |
|
|
| Width(mm) | 1220mm |
|
|
| Thickness(mm) | 0.5-1mm |
|
|
| Yield stress(mm) | G220-G300 |
|
2. | Product | Detail as the attached file | ||
|
| Length | Any length |
|
3. | Power | Type | 220v/380v/3ph/50hz |
|
|
| Main Motor power | 11kw+11KW |
|
|
| Cutter power | 5.5kw |
|
4. | Forming speed(m/min) | 8-15 | Not include the time of cutting | |
5. | Manual Decoiler | Type | Manual |
|
|
| Max capacity | 5t |
|
|
| Suitable coil OD(MM) | 1000 |
|
|
| Suitable coil | 508 |
|
6. | Forming stand | 22 | Depend on actual design | |
7. | Thickness of structure | 20mm A3 steel plate |
| |
8. | Forming shaft diameter(mm) | 85 #45 steel |
| |
9. | Type of cutting | Roll formed and |
| |
10. | Control system | PLC and inverter | Panasonic brand | |
11. | Install dimension(depend on the final design) | 15.2m×1.5m×1.55m | Without panel length | |
12. | Total weight (Approx) | 10T | Depend on final design |
4.Flow chart:
5.Applications:
Floor deck is a lightweight decking system, for car pack
construction, comprising steel profile,
top - reinforced by concrete. Floor deck roll forming machine is
the essential manufacturer of its production
6.FAQ
1. what is your guarantee period?
Guaranteed against malfunctions due to manufacturing defects for 12
months from the date of loading.
2. Do you provide training for my workers?
The machine has been installed and tested well before shipping. It
is easy to operate.
Normally speaking, our customer follows the instruction book and
can operate the machine well.?
You can also come to our factory to check the machine and learn how
to operate before shipping. It only needs 2 hours and you can
operate well.
3. I do not know about the machine and do not know how to install
it. Can you install the machine in my factory?
If you need us to send engineers to your factory, you will pay for
the travel expense such as visa, round tickets, hotel, food Salary
of 80 USD per day per person (from departure from our factory,
until we are back to our factory). You also need to take care of
his safety.
4. What is included in the machine?
The process for work: decoiler→feeding→roll forming→measuring
length→cutting to length→product to stand
The whole line includes a manual decoiler, roll forming machine and
product stand. when you get the machine in your factory, you just
need to do following 3 things, and then you can start working.
a. Put the machine on the flat level ground.
b. Inject gear oil and hydraulic oil.
c. Connect 3 phase electric wire.
7. contact us