Home Companies Hangzhou FASEC Buildings Co.,Ltd.

Office Building Glass Light Wall Exterior Resistance Wind Curtain Wall

Hangzhou FASEC Buildings Co.,Ltd.

Contact Us

[China] country

Trade Verify

Address: No.3 Beishang New City, Xiacheng District, Hangzhou China

Contact name:Tomy.Gao

Inquir Now

Hangzhou FASEC Buildings Co.,Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Office Building Glass Light Wall Exterior Resistance Wind Curtain Wall

Country/Region china
City & Province hangzhou
Categories Putty Knives
InquireNow

Product Details

Aluminum Invisible Frame Office Building Glass Light Wall Resistance Wind Curtain Wall


Glass curtain wall construction technology

1. Process characteristics

1.1 The glass is fixed on the sub-frame with silicone structural sealant, and the sub-frame is fixed to the main frame (column, beam) by mechanical clamping. The structural glass assembly components are completely separated from the main frame, which is one of the biggest features of the hidden frame glass curtain wall component construction.
1.2 The structural glass assembly components are produced in a professional production workshop. The quality of the glue and the processing accuracy are guaranteed, and the silicone structural sealant is saved.
1.3 Columns and beams are cut by the manufacturer, with high processing accuracy and less material waste.
1.4 The key process of making structural glass assembly components is reduced on the construction site, the construction period is shortened, and the construction equipment is reduced.
1.5 Columns, beams, and glass plates are installed on site one by one, easy to install and easy to adjust.
1.6 The construction is simple, the process flow is clear and easy to understand, and the operator is easy to master, but it requires higher professional skills and overall planning ability of the manager.
2. Process flow
Construction preparation → measurement and setting out → embedded parts processing → connection angle installation → column installation → beam installation → structural glass assembly assembly production and installation → cleaning inspection → completion acceptance
3. Key points of construction operation
3.1 Construction preparation
3.1.1 Material preparation: According to the drawings and engineering conditions, prepare a detailed material ordering and supply plan.
3.1.2 Construction machinery: inspect the machinery used to ensure its good performance.
3.1.3 Personnel preparation: Provide technical training and confession to skilled workers.
3.1.4 Technical preparation: Be familiar with the drawings, and prepare the tables for the relevant atlases, quality acceptance standards and internal business data.

 

Performance Parameter
PerformanceEU-STDGB/T7106 GB/T8484
Air TightnessClass4Class8
Water TightnessE1500Class6
Wind ResistanceC5Class9
Insulating PropertiesK 1.45W/·KClass8
Sound InsulationRw=dB39
Glazing 5+12A+5+12A+5
 

 
 






 
 
 
Our  Certification:

 

Performance Parameter
PerformanceEU-STDGB/T7106 GB/T8484
Air TightnessClass4Class8
Water TightnessE1500Class6
Wind ResistanceC5Class9
Insulating PropertiesK 1.45W/·KClass8
Sound InsulationRw=dB39
Glazing 5+12A+5+12A+5
 

Hot Products

Waterproof and Heat Preservation Sandwich Panel and Cold Room Isolation Plate for Warehouse FAMOUS ...
Specifications The technical standard of PUR panel No. Item Unit Tel. Requirment 1 Density kg/m3 40...
nsulated Concrete Forms ICFs Blocks only need to install modules, concrete pouring, EPS modular ...
nsulated Concrete Forms ICFs Blocks only need to install modules, concrete pouring, EPS modular ...
nsulated Concrete Forms ICFs Blocks only need to install modules, concrete pouring, EPS modular ...
nsulated Concrete Forms ICFs Blocks only need to install modules, concrete pouring, EPS modular ...