Trumony Aluminum Limited |
Verified Suppliers
|
|
7xxx High Anti-Corrosion Aerospace Aluminum Alloy Plate
We are supplying the 7xxx series aluminum alloy plate,including 7020/7N01/7075/7050,which are widely used for aero& aviation,railway transportation, automotive ,marine and
offshore engineering,energy sources,tool and mould etc.
The 7xxx series aluminum alloy has many good advantages,for
example:low density, moderate strength, easy processing and
forming, strong corrosion resistance, abundant resources and strong
recyclability, the development of aviation industry has formed an
inexplicable relationship with the application of aluminum alloy
materials.
Specification of 7xxx aluminum alloy plate:
Alloy: 7020/7N01/7075/7050
Temper: O/T4/T6
Thickness: 0.20-3.5mm or as per customers' requirement
Width: 1200-2650mm or as per customers' requirement
Length: 2000-12000mm or as per customers' requirement
We are supplying the extra thick,extra wide and
extra long aluminum alloy plate.
Other sizes is available according to customer's request.Besides
aluminum alloy plate,we are also supplying the aluminum coil as per
customers' requirement.
Application:
7xxx | 7050 | Radar structural parts ,manufacturing structure of aircraft, other high stress structural elements which demand high strength and strong corrosion resistance etc. |
7075 | Aviation, aerospace, moulding, mechnical equipment, tooling and fixture etc. | |
7N01 | Bed plate of high speed train and coal transportation vehicle etc. | |
7021 | Unit load device of aviation,components for aerospace and aviation |
Typical Chemical composition:
ALLOY NO. | Si | Fe | Cu | Mn | Mg | Cr | Zn | Ti | Al |
7075 | 0.4 | 0.5 | 1.0-2.0 | 0.3 | 2.1-2.9 | 0.18-0.28 | 5.1-6.1 | 0.2 | Rem |
7050 | 0.12 | 0.15 | 2.0-2.6 | 0.1 | 1.9-2.6 | 0.04 | 5.7-6.7 | 0.06 | Rem |
Terms and conditions:
Trade term:CIF / CFR / FOB
Payment term:30% before production+70% before shipment;or 100%
Irrevocable L/C at sight;Or we can further cummunicate with each
other about this part.
Shipment:Normally it is about 30-35days
MOQ:5 metric tons for each thickness. (Normally it is formed
according to the concrete specifications.)
Quantity tolerance:+/-10% of total quantity as confirmed PI.