Zibo JC Eco-tech Co.,Ltd. |
|
Specifications
Be used to melt 1-4kg gold
Electrical type with low consumption and high efficiency
Furnace Description
China Supplier Factory Sell 1kg Gold Melting Induction Furnace is designed with a lightweight, but extremely durable Silicon Carbide Chamber.It has advantages of excellent strength, handling and integrity at high temperatures.
This 1kg Gold Melting Induction Furnace meets the needs for individuals who are melting small to medium jobs. The unit is light and compact for easy travel.
Melting Material
Some of the Metals that can be melted with this Furnace:Aluminum, Gold, Lead, Silver, Sterling Silver, Tin & Zinc.Melts Pure Jewelry grade Metals such as: Gold 8k-24k, Silver (coin,sterling,fine), Copper, and more.
Furnace Accessories
Furnace Detail Pictures
Difference Features with Other Similar Furnace
Items | JC Electric Furnace | Other Similar Furnace |
Furnace chamber | Adopts new advanced SIC material with no crack no distortion under normal temp 1-1200 Degrees Celsius,which prevents disadvantage of short work life with tranditional ceramic fiber, quartz chambers. | Traditional chamber material:ceramic fiber, quartz with easy crack and distort after use 2-3 times,which easily lead to short circuit and reduce work life. |
Heating Coil | Material: Fe-Cr-Ni alloys Limited test temp up to 1600°C,make sure long continues continuous work time under normal 1200°C,which effectly extend furnace work life | Easy to crack after use 2-3times and lead to be out of work,it is very complicated process if replace coil singly,also many end users unable to replace it successfully by themselves. |
Heating Speed | JC-K-220-1(220V1Kw) 25-30Mins JC-K-220-1(220V 2Kw) 15-20Mins | 25-45mins: Reheat:15-30mins Then need 10-15mins to complete finish the melting. |
Working temp | 1-1200 Degrees Celsius | 1-1150 Degrees Celsius |
Furnace Package
Furnace Instruction
1. Put the molten gold into the crucible,then put the crucible into the furnace.
2.open green switch power supply, then red switch.
3. temperature controller with the digital furnace is slowly
rising.
4.When the temperature reached 1150 degrees,the red light indicator cut off.
Then cut off red switch and green switch,take out the molten crucible from the furnace.
5. Please pay attention to safety and maintain mormal use of machine.
Furnace Shipping
1-10Units,DHL,Fedex,EMS Express:3-5working days
Above 10Units,Sea tranport,this way can save a lot of your purchasing cost.
We have professional packaging and shipping insurance so your purchase will arrive safely.
Contact Information
If you need any assistance ,please be free to contact with us.