Zhenglan Cable Technology Co., Ltd |
Verified Suppliers
|
|
0.6/1 KV CU/XLPE/PVC/SWA/PVC N2XY Copper Conductor 50mm 70mm 95mm 120mm2 XLPE Insulation LV Power Cable
Application
The products are generally used for fi xed installation. Suitable for building wiring, especially in areas where smoke and fume emissions may cause a potential threat to life but not for burial in the ground, either directly or in ducts.
Colour Code 1 Core : Brown 2 Cores: Brown or Blue 3 Cores: Brown, Black, Grey 4 Cores: Blue, Brown, Black, Grey 5 Cores: Green-yellow, Blue, Brown, Black, Grey Above 5 Cores: White Cores with black numbers
Filler(optional) PVC or Polypropylene yarn Binder Tape(optional) Polyester (Mylar) tape
Technical parameter
Conductor dimensions (mm2) | Insulation thickness (mm) | Nonmetallic sheath, unarmored cable | |||||
Sheath thickness mm | Outer diameter (approximate) mm | Cable weight (Kg/km) | |||||
2C | 3C | 2C | 3C | 2C | 3C | ||
1.5 | 0.8 | 1.8 | 1.8 | 10.4 | 10.8 | 113 | 124 |
2.5 | 0.8 | 1.8 | 1.8 | 11.2 | 11.7 | 128 | 144 |
4 | 1 | 1.8 | 1.8 | 12.9 | 13.6 | 161 | 189 |
6 | 1 | 1.8 | 1.8 | 13.9 | 14.7 | 193 | 221 |
10 | 1 | 1.8 | 1.8 | 16.2 | 17.1 | 254 | 303 |
16 | 1 | 1.8 | 1.8 | 18.4 | 19.5 | 331 | 412 |
25 | 1.2 | 1.8 | 1.8 | 21.2 | 22.5 | 445 | 547 |
35 | 1.2 | 1.8 | 1.8 | 23.6 | 21.4 | 533 | 652 |
50 | 1.4 | 1.8 | 1.8 | 26.8 | 28 | 636 | 837 |
70 | 1.4 | 1.9 | 2 | 23.4 | 27.2 | 770 | 1071 |
95 | 1.6 | 2 | 2.1 | 27.2 | 31.4 | 1011 | 1412 |
120 | 1.6 | 2.1 | 2.2 | 29.8 | 34.3 | 1217 | 1701 |
150 | 1.8 | 2.2 | 2.3 | 32.6 | 37.9 | 1486 | 2093 |
185 | 2 | 2.4 | 2.5 | 38.6 | 42.3 | 1857 | 2571 |
240 | 2.2 | 2.6 | 2.7 | 43.8 | 49.7 | 2351 | 3296 |
300 | 2.4 | 2.7 | 2.9 | 48.8 | 52.8 | 2854 | 4016 |
400 | 2.6 | 3.1 | 59.8 | 5165 | |||
500 | 2.8 | 3.4 | 74.2 | 6431 |
Show
About us
We, Zhenglan Cable Technology Co., Ltd, are manufacturer of cable
and wire with over 20years' experience.
Our factory workshop taking up about 60000SQM is located in Wuzhi
County, Jiaozuo city, Henan province, in the middle of China.
Our main products are
FAQ
1. Is your company a factory or a trade company?
Factory, more than 20 years in China
2. How long can I expect to get the sample?
After you pay the freight charge and send us confirmed files, the
samples will be ready for delivery in 3-7 days. The samples will be
sent to you via express and arrive in 3~7 days. You can use your
own express account or prepay us if you do not have an account.
3. What are your payment terms?
We normally accept T/T 30% deposit, 70% balance before delivery as
the main payment terms, and other payment can also be negotiated.
Trade assurance on Alibaba is also available.
4. What’s the delivery time?
Sample order needs 3~5 days. Formal order depends on the quantity.
Usually it needs 7-30 days after get your payment.
5. What is your MOQ?
Generally it is 500m.