All aluminum alloy conductor 240mm2(19/4.01mm)IEC61089 overhad bare
aluminum conductor
Application
All-aluminum alloy conductor (AAAC) cables are mainly used as
overhead transmission cables and primary and secondary distribution
cables. It is suitable for laying in basins, rivers and canyons
with special geographical characteristics.
Electrical properties
Density@20ºC 2.70 kg/dm
Temperature coefficient @20°C 0.00360 (°C)
Resistivity @20°C 0.0326 Ohms mm²/m
Linear change rate of linear expansion coefficient 23 x10-6(°C)
AAAC conductor Greeley 927.2mcm (37/4.02mm) aluminum alloy
conductor for overhead use Technical parameters
Code | Nominal Area | Stranding | Overall Diameter | Weight | Rated Strength | Electrical Resistance |
| mm2 | No.x mm | mm | Kg/Km | KN | Ω/Km |
240 | 239.96 | 19/4.01 | 20.1 | 661.1 | 75.59 | 0.1397 |
All aluminum alloy conductor 240mm2(19/4.01mm)IEC61089 overhad bare
aluminum conductor product Images
Why you choose us?
- Products comply with GB, IEC, BS, ASTM, DIN, VDE and JIS standards;
Customer standard requirments Accepted;
- Certified to ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007;
- Registered capital of $30 million and factory covers an area of
60,000㎡;
- Advanced test equipment and procedures, 100% inspection before
factory;
- Enough stocks and the higest efficient shipping time guarranteed;
FAQ
- Is your company a factory or a trade
company? --- Factory, more than 20 years in China
- How long can I expect to get the sample?---After you pay the
freight charge and send us confirmed files, the samples will be
ready for delivery in 3-7 days. The samples will be sent to you via
express and arrive in 3~7 days. You can use your own express
account or prepay us if you do not have an account.
- What are your payment terms?---We normally accept T/T 30% deposit,
70% balance before delivery as the main payment terms, and other
payment can also be negotiated. Trade assurance on Alibaba is also
available.
- What’s the delivery time?---Sample order needs 3~5 days. Formal
order depends on the quantity. Usually it needs 7-30 days after get
your payment.
- What is your MOQ?---depends on the cable type you need.