Home Companies Jinzhou City Shitan Machinery Equipment CO. LTD.

St 450 Meters Deep Crawler Mounted Drill Rig Large for Water Well

Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Us

[China] country

Trade Verify

Address: Xiaoshang Village, Yingli Town, Jinzhou City, Hebei Province, China

Contact name:Anna

Inquir Now

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

St 450 Meters Deep Crawler Mounted Drill Rig Large for Water Well

Country/Region china
City & Province jinzhou hebei
InquireNow

Product Details

ST 450 Meters Deep Large Water Well Crawler Mounted Mounted Drill Rig

 

 

ST 450 Crawler Mounted Drill Rig Introduction

 

ST 450 Meters Hydraulic Crawler Drilling Machine is mainly used to drilling wells,irrigation wells,ground source heating pump wells and boreholes for other purposes,especially for mountain and rock formation well projects,the drilling depth is 450 meters ,hole-diameter is 105-350 mm ,lift power is 24MT.It is mainly suitable for drilling wells, agricultural irrigation wells, geothermal air conditioning holes and other well holes, It is especially suitable for water intake projects in mountainous and rocky strata.

 

ST 450 Crawler Mounted Drill Rig Techs

 

Drilling depth
450m
Dia.hole
φ105-305mm
Advance Length one time
6.6m
Working pressure
1.7-3.3MPa
Air consumption
17-35m³/min
Length of rod
1.5m,2m,3m, (6m can be choosed)
Dia. Of rod
φ89,φ102,φ114
Lifting power
24T
Rotation torque
6200-8500 N.m
Rotation Speed
55-115r/min
Diesel Engine
Yuchai
Engine Power
85Kw/2200rpm
Travelling speed
0-2.5 Km/h
Climb capacity
30°
Weight
9000kgs
Dimension
5500x1900x2780mm
Application
Complicated geological conditions: Rock, Mud, Sand etc.
Drilling Way
Top drive hydraulic rotary and propulsion, Dth Drilling or Mud Pump Driling
DTH Hammer
4",5",6",8",10" Drill hammer or CIR110, 130, 150,170
 

 
ST 450 Crawler Mounted Drill Rig Features
 
The mutifunctional drill rig of geothemal well is an improved device. Equipped with the Yuchai four cylinder engine, the drill rig meets national standards for emissions and environment. Meanwhile, the hydraulic system, supporting configuration and appearance, etc. have been optimized, thus improving the performance and working efficiency. The double rotation motor increased the rotaty torque and revolving speed.
The one-ton winch is optional for the multifunctional drilling rig of geothermal well, make the lifting easier. In addition, the 1.5m supporting oil sylinder is also optional, making the loading and tracsport convenient.
Shitan Machinery Drilling Rig FAQ
 
1. It has different models used for water well drill rig,mine blast hole drill,underground drill project,,etc
2.T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
3.Generally, it will take 7 -10 working days after receiving your advance payment.
The specific delivery time depends on the items and the quantity of your order.
4.Our main machine enjoys a 1 year warranty(except for the hammer), during this time all accessories
broken can be changed for a new one.And we provide videos for machine install and operation.

 
How to select the drilling section.
 
Drilling machine
When selecting the place for drilling wells, try to avoid selecting suburban or smaller towns or rural areas, because the sewage or drainage facilities in these places are not sound enough, so it is easy to pollute the water quality of the wells. In addition, some suburban or village areas have some farmland or vegetable fields, and the current crops are all applied with chemical fertilizers and pesticides. Therefore, if these pesticides and fertilizers are not easy to decompose in the land, they will seep into the underground water with the water source. Therefore, we should keep away from the polluted areas as far as possible when drilling wells. If there are farmland or vegetable fields around, it is suggested to drill the well deeper and make anti-seepage treatment around the well if the well drilling machine cannot be avoided. Hollow cement columns can be used to form isolation.
In addition, it is necessary to avoid rocks when selecting the section where the drilling machine is drilling, because the underground conditions are complex and changeable. The shallow layer of the underground stratum (within several kilometers) is layered, and there may be special geological phenomena such as fold fracture, basement uplift and depression. Therefore, if it is not a fixed location, it is difficult to describe the underground geological conditions of a specific location with the underground conditions of a certain region.

 


 
 
 
 
 
























Hot Products

St 260 Meters Large Horse Power Yuchai Diesel Engine Customized Borehole Water Well Drilling Rig ...
Gy200 Investigation Prospecting 300 Meters Water Well Borehole Drilling Rig GY200 Water Well ...
Rocky Strata Deep Hard Stone 200 Meters Water Well Drilling Rig ST 200 ST 200 Water Well Drilling ...
Large Horsepower Rock Blasting ST 200 Water Well Borehole Drilling Rig ST 200 Water Well Drilling ...
Borehole Blasting 400 Meters Depth Water Well Drilling Machine with Customized Diameter​ ST400 Water ...
180 Meters Water Well Drilling Rig Industrial Deep Borehole Rock Stone Blasting ST 180 Water Well ...