Home Companies Jinzhou City Shitan Machinery Equipment CO. LTD.

350m Deep Crawler Mounted Drill Rig Multifunctional Dth Borehole

Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Us

[China] country

Trade Verify

Address: Xiaoshang Village, Yingli Town, Jinzhou City, Hebei Province, China

Contact name:Anna

Inquir Now

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

350m Deep Crawler Mounted Drill Rig Multifunctional Dth Borehole

Country/Region china
City & Province jinzhou hebei
InquireNow

Product Details

Crawler Mounted 350m Deep Multifunctional DTH Borehole Water Well Drilling Rig Machine

 

 

ST 350 Pneumatic Drilling Machine Introduction

 

ST 350 Pneumatic Drilling Machine geothermal well multi-purpose drilling rig is a lightweight, efficient and versatile drilling equipment. It has the advantages of advanced structure, convenient use, high work efficiency, high reliability and good durability. It is widely used in wellbore applications such as drilling wells, agricultural irrigation wells, geothermal air conditioning wells, etc. It is especially suitable for mountain and rock formation water intake projects. Equipped with rubber crawler self-propelled for easy movement.

 

ST 350 Pneumatic Drilling Machine Technicals

 

Model
ST 350 Meters Pneumatic Drilling Machine
Drilling depth
350m
Dia.hole
φ105-305mm
Advance Length one time
6.6m
Working pressure
1.7-3.3MPa
Air consumption
17-35m³/min
Length of rod
1.5m,2m,3m, (6m can be choosed)
Dia. Of rod
φ89,φ102,φ114
Lifting power
24T
Rotation torque
6200-8500 N.m
Rotation Speed
55-115r/min
Diesel Engine
Yuchai
Engine Power
85Kw/2200rpm
Travelling speed
0-2.5 Km/h
Climb capacity
30°
Weight
9000kgs
Dimension
5500x1900x2780mm
Application
Complicated geological conditions: Rock, Mud, Sand etc.
Drilling Way
Top drive hydraulic rotary and propulsion, Dth Drilling or Mud Pump Driling
DTH Hammer
4",5",6",8",10" Drill hammer or CIR110, 130, 150,170
 

 


ST 350 Pneumatic Drilling Machine FAQ
 
1. It has different models used for water well drill rig,mine blast hole drill,underground drill project,,etc
2.T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
3.Generally, it will take 7 -10 working days after receiving your advance payment.
The specific delivery time depends on the items and the quantity of your order.
4.Our main machine enjoys a 1 year warranty(except for the hammer), during this time all accessories
broken can be changed for a new one.And we provide videos for machine install and operation.

 

Oil Filter Element Replacement 

 

1. Unscrew and discard the oil filter.

2. Clean the filter shell by self suction and dredge the front and rear differential pressure through holes.

3. Check whether the differential pressure transmitter is normal.

4. Fill the new filter element with oil and apply a layer of oil on the sealing ring of the filter element.

5. When installing the filter element, screw it until it contacts the sealing gasket, and then manually tighten it by 1 / 3 turn.

6. After startup, check whether there is leakage.

 

Warning on safety precautions of water well drilling rig


Warnings on safety precautions that must be read and understood by all operators and maintenance personnel of the drilling rig:
1. Before repairing the drilling rig, first close the main air inlet pipe and empty the air path.
2. When the traveling motor is started, pay attention to the forward and backward speed of the drill. When towing, do not stay or walk between the two machines
3. When connecting and removing the drill pipe, the spindle of the rotary head must rotate slowly to prevent the fork and the J-shaped wrench from slipping and rebounding;
4. The jack is only used for leveling the drilling rig and loading and unloading during transportation. It is strictly prohibited to deal with stuck drilling accidents.
5. When the drilling rig is displaced, the drilling rig can only be moved when the carriage is completely upright and fixed with bolts or the carriage is completely flat.

 

 


 


 
 
 
 

Hot Products

St 260 Meters Large Horse Power Yuchai Diesel Engine Customized Borehole Water Well Drilling Rig ...
Gy200 Investigation Prospecting 300 Meters Water Well Borehole Drilling Rig GY200 Water Well ...
Rocky Strata Deep Hard Stone 200 Meters Water Well Drilling Rig ST 200 ST 200 Water Well Drilling ...
Large Horsepower Rock Blasting ST 200 Water Well Borehole Drilling Rig ST 200 Water Well Drilling ...
Borehole Blasting 400 Meters Depth Water Well Drilling Machine with Customized Diameter​ ST400 Water ...
180 Meters Water Well Drilling Rig Industrial Deep Borehole Rock Stone Blasting ST 180 Water Well ...