Home Companies Jinzhou City Shitan Machinery Equipment CO. LTD.

Geothermal Pneumatic Drilling Rig 180 Meters Depths For Rocky Layers

Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Us

[China] country

Trade Verify

Address: Xiaoshang Village, Yingli Town, Jinzhou City, Hebei Province, China

Contact name:Anna

Inquir Now

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Geothermal Pneumatic Drilling Rig 180 Meters Depths For Rocky Layers

Country/Region china
City & Province jinzhou hebei
Categories Pharmaceutical Machinery
InquireNow

Product Details

Geothermal 180 Meters Depths Hard Stone Large Pneumatic Drilling Rig ST 180

 

 

ST 180 Pneumatic Drilling Rig Introduction

 

ST 180  is as a new,highly-effective ,energy-saving and multifunctional hydraulic drill and it is specialized in drilling well ,monitoring well, geothermal air-conditioning hole,grouting hole of the hydropower cofferdam .The drill rig is equipped with hydraulic motor rotation with a high power,propulsion and lifting of cylinder and down-hole impacter with high blast pressure
 
ST 180 Pneumatic Drilling Rig Tech Details

 

Drilling Depth180 Meters
ChassisRubber track
Drilling diameter(mm)130-254
Drilling Rig modelST 180
one-time advance length(m)3.6
Walking Speed(km/h)2.5
Gradeability30
Engine brandYunnei
Main motor power42kw
Working pressure(mpa)1.45-2.5
Air consumption(m³/min)17-31
Drill pipe diameter(mm)76/89
Drill pipe length(m)1.5/2.0/3.0
Lifting force(t)12
Rotating speed(rpm)40-65
Rotary torque(N.m)3500-3800
Dimensions3500*1700*2250
Machine weight(t)4.5


ST 180 Pneumatic Drilling Rig Advantages

 

1, The engine using qianchai 55Kw turbocharged diesel engine;
2 Walking devices: walking motor with gear box, long working life;
3, The hydraulic pump: parallel gearbox design (patent) separate pump, the power to provide adequate distribution, unique hydraulic system design, maintenance is simple with lower costs;
4, The power head device: gearbox casting, double motor to provide power, large torque, durability, maintenance cost is lower;
5, professional digging machine rubber chassis, durable, large bearing capacity, wide chain plate, which has no damage to the hard road;
6, The lifting force: patented design compound arm, arm in small size, long stroke, double cylinder upgrade, lifting with large tonnage;
7, Lifting arms of each rig are installed limiter to protect the cylinder safety cylinder and to protect the security of the work process;
8, Each of the hydraulic oil tube are wrapped with protective jacket, which make the oil tubes have a longer service time.

 

ST 180 Pneumatic Drilling Rig Main Applications

 

It is mainly used for drilling in hilly, mountains and other rocky areas.

High power diesel engine, the operating handles are centralized ,the layout is reasonable.

It is equipped with high hydraulic outrigger for loading and unloading.

Equipped with hydraulic feeding system, large torque, fast footage and high drilling efficiency

Steel crawler chassis can easily deal with various complex operation sites.

 

What should be paid attention to in the installation of hydraulic water well drilling rig

 

1. When entering the construction site, the drilling equipment shall be fixed, the drilling area shall be larger than the seat of the drill, and there shall be sufficient safety space around. 2. When drilling, construction shall be carried out in strict accordance with the position, direction, angle and depth of the hole. Hydraulic water well drilling rig shall not be modified without authorization. 3. During the installation of drill pipe, check the drilling equipment to ensure that the drill pipe is not blocked, bent, and the steel wire mouth is not worn. It is strictly prohibited to unqualified the drill pipe. 4. When loading and unloading the drill bit, strictly prevent the pipe clamp from clamping the cemented carbide parts, and strictly prevent the flat drill bit and the core pipe. 5. When installing the drill pipe, the second one must be installed after installation. 6. When drilling with clean water, water supply is not allowed before drilling. After the water returns, the drilling pressure can be increased. Ensure that there is sufficient flow, dry holes are not allowed, and the amount of rock in the holes should be increased. After the actual drilling, you can stop drilling. 7. The distance shall be measured accurately during drilling. Usually, the drill pipe must be measured every 10m, or the drilling tool must be changed to verify the drilling depth. 8. The gearbox, bushing and vertical shaft gear are free from overheating. If there is any abnormal sound, stop the problem immediately, find the cause and deal with it in time.

 



 
 

 
 
 
 
 
 
 

Hot Products

Crawler Drilling Rig For Water Well Drilling Rig Machine Driven By Diesel Engine Introduction of 200 ...
Rocky Blasting Deep Underground Borehole Water Well Drilling Rig With 450 Meters ST 450 Water Well ...
Fast Speed Deep Borehole 350 Meters Water Well Drilling Rig For Industry Business Fast Speed Deep ...
St 260 Meters Large Horse Power Yuchai Diesel Engine Customized Borehole Water Well Drilling Rig ...
XY-1A Portable Shallow Less Depth Borehole Water Well Drilling Rig Machine XY-1A Water Well Drilling ...
Gy200 Investigation Prospecting 300 Meters Water Well Borehole Drilling Rig GY200 Water Well ...