Home Companies Jinzhou City Shitan Machinery Equipment CO. LTD.

450m Crawler Mounted Borehole Drilling Machine Diesel Engine Driven Dth

Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Us

[China] country

Trade Verify

Address: Xiaoshang Village, Yingli Town, Jinzhou City, Hebei Province, China

Contact name:Anna

Inquir Now

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

450m Crawler Mounted Borehole Drilling Machine Diesel Engine Driven Dth

Country/Region china
City & Province jinzhou hebei
InquireNow

Product Details

450m Crawler Mounted Diesel Engine Driven Borehole DTH Pneumatic Water Drilling Rig Machine

 

Introduction of crawler type water well drilling rig:

 

Pneumatic Drilling Rig Hengwang pneumatic drilling rig is especially suitable for water intake in mountainous and rocky strata.Pneumatic water well drilling machine should be used together with air compressor, it can add mud pump and foam pump. Need to use different drilling tools such as: drill rod, hammer, rock drill bits, etc.

 
Parameters of crawler type water well drilling rig:
 
Product Name
Pneumatic Drilling Rig
Model
ST400
Drilling Diameter
105-300mm
Drilling Depth
400m
One-time Advance Length of the Drill
3000/6000mm
Walking Speed
6km/h
Climbing Ability
25
Min. Ground Clearance
300mm
Working Air Pressure
1.7-3.5Mpa
Air Consumption
17-35m3/min
Main Power
100KW/6Cylinder
Rotation
45-75rpm
Rotary Torque
9000-10000N.m
Dimension

6m×2m×2.5m

Total Weight
10T

 

Application scope and characteristics of drilling rig

 

All drilling rigs here are multifunctional, it can be used with air compressor, mud pump, even we can just use the dry hydraulic drilling method.

The drilling rigs are not only designed for water drilling. They can be used in all conditions based on pore-forming purpose.

They are widely used in industrial and agriculture water project, testing well and other exploration borehole. In particular, drilling hole for geothermal heating, it can also meet the engineering basis for reinforcement, loose gravel drilling rock formation connected with a variety of engineering.

Our drilling rigs are more efficiency and with low failure rate, more economic and durable, and with a high comprehensive cost performance.

 

Host structure and working principle


1. Chassis rubber wheel chassis. Drag to walk.
2. The frame of frame welding structure is welded on the chassis. When the carriage is erected, it can be connected with the frame with bolts
As a whole, improve the rigidity of the carriage.
3. The carriage with welded structure adopts hot-rolled carbon channel steel and square steel pipe as the guide rail of the swivel head,
The oil cylinder is controlled to rise and fall smoothly through the one-way throttle valve. The verticality is controlled by the level and angle gauge on the console.
4. The slewing mechanism is composed of hydraulic motor and slewing reducer. Two high-performance low-speed high torque hydraulic horses
To drive the rotary reducer, you can obtain different torque and speed.

 

How to maintain water well drilling rig?


The manufacturer of water well drilling rigs said that when we use water well drilling rigs, we should not forget to maintain them. What should we pay attention to? Pay attention to check the lubricating oil condition of the wind motor at any time. Pay attention to check whether the water and gas pipelines and the bolts and nuts of all accessories of the drilling rig are firm at any time. When the working face is immersed in water, use a large-diameter drill head to insert the drill pipe when opening the hole, so that the drill pipe is 1-2 meters above the water surface, so as to prevent mud and rock debris from falling into the hole. It is not allowed to reverse during the drilling operation of the water well drilling rig, so as to prevent the drill pipe from falling into the hole, When the water well drilling rig stops working in a short time, a small amount of air pressure should be given to prevent sediment from immersing into the interior of the drilling rig impactor. If the drilling rig stops working for a long time, the sound of the impactor and the operation of the reducer should be checked. If abnormal sounds and phenomena are found, the machine should be shut down immediately and checked in time.

 

 

 

 

Hot Products

ST 180 Portable Fast Speed Farming Water Well Drilling Rig ST 180 Water Well Drilling Rig Decription ...
Crawler Drilling Rig For Water Well Drilling Rig Machine Driven By Diesel Engine Introduction of 200 ...
St 260 Meters Large Horse Power Yuchai Diesel Engine Customized Borehole Water Well Drilling Rig ...
Gy200 Investigation Prospecting 300 Meters Water Well Borehole Drilling Rig GY200 Water Well ...
Rocky Strata Deep Hard Stone 200 Meters Water Well Drilling Rig ST 200 ST 200 Water Well Drilling ...
Large Horsepower Rock Blasting ST 200 Water Well Borehole Drilling Rig ST 200 Water Well Drilling ...