Jinzhou City Shitan Machinery Equipment CO. LTD. |
Verified Suppliers
|
|
GY200 Exploration Soil Test Drilling Rig Machinery
GY200 Soil Test Drilling Rig Introduction
It is a portable multi-purpose engineering survey and construction drilling rig. It is suitable for geological exploration of industrial, civil buildings, railways, bridges and hydropower projects, as well as the construction of small-diameter foundation pile holes.
GY200 Soil Test Drilling Rig Technical Data
Borehole diameter | 75,91,110,130,150,300 |
Drilling depth | 0-300m |
Drill pipe diameter | 42,50,60mm |
Angle range | 0°-360° |
Size(L*W*H) | 1860*780*1480mm |
Weight(without power unit) | 900kg |
Spindle speed(8-speed) | 53,92,145,200,250,435,668,947 r/Min |
Spindle stroke | 500mm |
Upward max speed of spindle(no load) | 0.05m/s |
Downward max speed of spindle(no load) | 0.067m/s |
Max feeding force of spindle | 36KN |
Max lifting force of spindle | 49KN |
Max output torque of spindle | 2500N.m |
Hoist(winch) | |
Max.lifting capacity(single rope) | 25KN |
speed | 34, 59, 94, 129r/min |
Hoist drum linear velocity(two levels) | 0.166, 0.331, 0.733, 1.465m/s |
Wire rope dia | 12.5mm |
Wire rope capability | 30m |
Oil pump | |
Rated pressure | 16Mpa |
Displacement | 16ml/r |
Rated speed | 2500r/min |
Power(diesel engine or motor) | |
Model(diesel engine) | 2100 |
Rated power | 17.6kw |
GY200 Soil Test Drilling Rig Features:
1. It has an automatic oil pressure feeding mechanism to improve
drilling efficiency and reduce workers' physical labor;
2. The ball clamping mechanism is used to replace the chuck,
3. Equipped with hole bottom pressure gauge to indicate the
pressure, which is convenient to master the situation in the hole;
4. The handle is centralized and easy to operate;
5. Compact structure, drilling rig, water pump and diesel engine
are installed on one base, occupying a small area of the airport;
6. Light weight, strong decomposability, easy to move, suitable for
working in plain or mountainous areas.
7.The drilling rig is suitable for general survey, geophysical exploration, road and building exploration, etc.
8. Alloy, steel sand and steel particle bits can be selected for drilling according to different formations.
9. It can drill sandy clay and bedrock of grade 2-9.
GY200 Soil Test Drilling Rig Core Drilling Principle
The principle of core drilling machine is basically the same, and the main components are drilling machine, drill pipe, drill bit, etc. The drill provides power to drive the drill pipe and drill bit to drill and obtain deep core samples. According to different depths and strata, corresponding to different types of drilling rigs
Correct Use of Small Geophysical Drilling Rig In order to ensure the normal construction of the drilling rig and avoid failures as much as possible, it is important to know the correct use of the drilling rig in addition to selecting a drilling rig with good quality and performance1, First of all, there must be an essential first step, that is, the installation and preparation of the drilling rig. 1. Prepare the rock drilling cavern. The cavern specifications can be determined according to the drilling method. Generally, when drilling horizontal holes, the cavern height is 2.6-2.8 meters, when drilling upward holes, and when drilling downward holes or inclined holes, the cavern width is 2.5 meters, and the height is 2.8-3 meters. 2. Lead the air and water pipelines, lighting lines, etc. to the working face for future use. 3. The column shall be erected firmly according to the design requirements of the hole. The upper and lower ends of the pillar shall be padded with wood plates, and the horizontal shaft and snap ring shall be installed on the pillar according to a certain height and direction. The machine shall be lifted by the hand winch, fixed on the pillar according to the required angle, and then the hole direction of the drill shall be adjusted.2, Secondly, the second key step is the inspection before operation. 1. When starting work, carefully check whether the air and water pipelines are firmly connected and whether there is air and water leakage. 2. Check whether the oil injector is filled with oil. 3. Check whether the screws, nuts, joints, etc. of each part have been tightened, and whether the column is firmly jacked.3, Then, it is the drilling operation procedureWhen opening, start the motor first, and pull the push handle of the manipulator after the transfer is normal. Make it get a proper propulsion force, and then pull the handle controlling the impactor to the working position. After rock drilling, the water valve can be opened to keep the air water mixture at a proper proportion. Stop the operation of the motor, stop the air and water supply to the impactor, insert the fork into the drill pipe slot of the tool holder, make the motor reverse the sliding plate back, disconnect the joint from the drill pipe, connect the second drill pipe, and press down to work continuous