Home Companies Jinzhou City Shitan Machinery Equipment CO. LTD.

Crawler Type ST-3 Geological Drilling Rig Machine For Railways / Core Drilling

Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Us

[China] country

Trade Verify

Address: Xiaoshang Village, Yingli Town, Jinzhou City, Hebei Province, China

Contact name:Anna

Inquir Now

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Crawler Type ST-3 Geological Drilling Rig Machine For Railways / Core Drilling

Country/Region china
City & Province jinzhou hebei
Categories Manufacturing & Processing Machinery Processing Services
InquireNow

Product Details

Crawler Type ST-3 Geological Drilling Rig Machine For Railways / Core Drilling

 

Specifications:

 

1. hydraulic control
2. Engineering geological survey, hydrology, water wells,sky buildings,dams,harbors

bridge,oil exploration,etc

3. oil motor, oil pump, quick joint so on are imported from US
4. power ,flexible and easy manitenance.

5. big pull force
6. large torque, wide range of speed

 

Description

 

1, the clutch is in the state, the belt does not rotate in front
Rigs 2 and 200 have no reversal or reversal
3, drilling rig can be decided angle straight and inclined type tower played the best selection of high speed soil 75~90.
4, the earth under the active drill pipe with variable diameter plus three wing bit
A rock drill rod diameter variable connecting head connected with the active hole pipe is connected with the drill rod, to a certain depth in the head, above 2m depth hole pipe into the core tube, 60 meters deep need for powder tube.

5, the diameter becomes bit.
6, to speed up, need to speed reducer belt rotation, drilling speed faster, but the endurance of drilling rig is low.
7, work efficiency: complete soil layer, hit 60 meters a day. General strata 16, 7 meters.
8, hydraulic oil with 32 oil, cold place with No. 42
9. Connection of wire rope and lifting device. The elevator is hung on the rope for pulling the drill pipe / active drill pipe, length of wire rope by derrick decided.
10, the coal mine roadway drilling rigs are available, without.

XY-3 Crawler Water well drilling machine Parameter

XY-3C Drilling rigThe hole machine parameters
Drill hole depth530m
The hole diameter75-530mm
Hole diameter300mm
Final hole diameter75mm
Pipef60
Borehole inclination90°--65°
Vertical shaft
Vertical shaft forward speed32-1057r/min
Vertical inversion speed29-137r/min
Vertical stroke600mm
Vertical inner hole diameter96mm
Vertical shaft hoisting capacity60KN
Primeary winding
Single rope winding speed0.5-1.9m/s
Diameter of wire rope12.5mm
Single rope hoisting capacity30KN
Drum diameter300mm
Drum capacity65m
Mud pump(optional)
Horizontal triplex BW-250 type of mub pump BW-250 mud pump
Displacement250L/min
Pressure of work80kgcm2
The inlet pipe diameter76mm
Outlet pipe diameter51mm
The gear pump
Duplex gear oil pumpCBF-F63/25
Before the traffic pressure63L/min 20Mpa
After the traffic pressure25L/min 20Mpa
Drilling rig power
The diesel engineYN27/39kw/2400rpm
motorY180L-4/22kw
Weight and size
Rig weight3600kg
Overrall diamensions3500*1900*2600mm

 

 

Hot Products

ST 200 m Mine Borehole Rock Drill Rig Drill rig Description: Brand: ST Name: ST-200 Mine Borehole ...
Drill Depth 300m underground diamond core water well drilling rig Drilling Rig Technical Data ...
Hydraulic Tracked Mounted geotechnical machinery borehole water well core drilling rig Features The ...
Underground Diamond Core Water Well Drilling Dig For Drill 100 m Depth ST-100 drilling rig is oil ...
ST 300 Trailer Mounted Water Well Drilling Rig With Drill Hole 300mm ST 300 Trailer Mounted Water ...
New Stone Tan ST-150 Water Well And Core Borehole Drilling Rig Description ST-150 Water Well And ...