Home Companies Sichuan Zuanshen Intelligent Machinery Manufacturing Co., Ltd.

Foundation Pits Multifunctional Drilling Rig Anchors Electric Power Tunnels

Sichuan Zuanshen Intelligent Machinery Manufacturing Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: No. 128, Hailin Road, Rongtai Avenue, Wenjiang District, Chengdu City, Sichuan, China.

Contact name:liu

Inquir Now

Sichuan Zuanshen Intelligent Machinery Manufacturing Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Foundation Pits Multifunctional Drilling Rig Anchors Electric Power Tunnels

Country/Region china
City & Province chengdu sichuan
InquireNow

Product Details

ZML160 Anchor drilling machine multifunctional crawler type drilling rig Drilling rig anchors

 

It is widely used in fields such as construction, highways, railways, water conservancy, electric power, tunnels, foundation pits, slopes, and military engineering.

Suitable for rock drilling in drift, egg, gravel layers, and layers covered by fractured and strongly weathered rocks, it can particularly demonstrate its efficient and stable performance. It can quickly and efficiently drill through complex formations and has broad application prospects in various geotechnical anchoring projects.

 

Technical specifications

 

PowerZML-160 electric typeengine55(Kw)
ZML-160 diesel typediesel74(Kw)
ZML-160 double powerengine55(Kw)
diesel74(Kw)
ZML-160 electric work diesel walkengine55(Kw)
diesel37(Kw)
Power headHole diameter90~250(mm)
HammerCIR,DHD
Rock broken waypercussion-rotary
Hole depth20-120(m)
Drill rod typeΦ76/Φ89*1500/2000/3000
Power head rotary speed35-70(rpm)
Power head max torque8000(N.m)
Power head max stroke3500(mm)
Max pulling force80(KN)
Whole machineDimension6600*2000*2700
Air consumption9~22(m3/min)
Drill angle0-360(°)
Rotary angle360(°)
Vice stroke1000(mm)
Rated pressure25(Mpa)
Climbing ability≦ 25(°)
Horizontal height3014mm
WeightAbout 8500kg

 

Main features

Dynamic system

The whole machine can replace different power heads(DTH, top drive, coring) according to construction needs, making construction more convenient, reducing costs, and doubling production;

 

Rotating arm structure

By adopting a rotary arm structure, the operating range after one positioning is greatly increased. The drilling arm can rotate about 360 °, achieving any angle construction;

 

Control costs

By using pilot valves and variable piston pumps with load feedback systems, it has the functions of power protection and pressure cut-off. While effectively adapting to the total flow demand of various executing components, it achieves the best power matching under different working conditions and maximizes energy conservation;

 

Security measures

When drilling, the wind and water linkage system is used to reduce the large amount of dust generated during tunnel construction. While drilling, the crushed stones are washed out of the hole through high-pressure water, reducing the problem of sticking during drilling, achieving the goal of rapid drilling, improving work efficiency, and reducing construction costs;

 

Pipe shed construction

Both single rod drilling and drilling with casing can be used. When the geological situation is complex and there is collapse, the casing construction method can be adopted, which means the outer casing and inner drill rod drill to the required depth at the same time. Firstly pull out the inner rod, then pull in the steel pipe, finally pull out the outer casing;

 

Emergency rescue

During the construction process, in case of danger, geological exploration, geological improvement, and support operations in the danger zone can be quickly completed. If the underground space is obstructed by collapse, casing operations can be used to quickly transport air, water, and other rescue materials to the trapped personnel;

 

Company Overview

Hot Products

ZMLH-08-A equipment used for borehole drilling 1,ZMLH-08-A High-Arm Rock Drilling Rig is designed ...
ZMLH-08-A High-Arm Rock Drilling Rig Elevating drilling rig 1,ZMLH-08-A High-Arm Rock Drilling Rig ...
DW902 Multi-functional Anchor Rod Carrier The DW902 anchor rod carrier is used for tunneling and ...
Hydraulic Jumbo Rock Drill Mining Hydraulic Tunneling Jumbo Used For Underground Mine​ Introduction: ...
Hydraulic Jumbo Rock Drill Underground mining rock drilling trolley Introduction: It is a small and ...
Hydraulic Jumbo Rock Drill And Underground Mining Rock Drilling Carriage Used For Mine Drilling Hole ...